IAC Assessment: SD0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Solar control window films
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 71,000
Annual Production 6,000 Pieces
Production Hrs. Annual 8,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $591,972 6,276,085 kWh $0.09
Electricity Demand $263,282 15,556 kW-months/year $16.92
Natural Gas $72,639 50,568 MMBtu $1.44
TOTAL ENERGY COSTS $927,893
RECOMMENDED SAVINGS* $45,754 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,454
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,033
Cost:
$1,033
$640 13,482 $393 23 - - $640
13,482
kWh
$393
23
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,892
Cost:
$6,734
$872 18,171 $1,020 60 - - $872
18,171
kWh
$1,020
60
kW-months/year
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,393
Cost:
$300
$1,393 29,015 - - - - $1,393
29,015
kWh
-
-
kW-months/year
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$13,056
Cost:
-
- - - - $13,056 - -
-
kWh
-
-
kW-months/year
$13,056
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$22,080
Cost:
-
- - - - $22,080 - -
-
kWh
-
-
kW-months/year
$22,080
-
$
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$1,575
Cost:
$2,000
- - - - $1,575 - -
-
kWh
-
-
kW-months/year
$1,575
-
$
07: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$4,725
Cost:
-
- - - - $4,725 - -
-
kWh
-
-
kW-months/year
$4,725
-
$
TOTAL RECOMMENDED Savings:
$45,754
Cost:
$10,067
$2,905 60,668 $1,413 83 $41,436 - $2,905
60,668
kWh
$1,413
83
kW-months/year
$41,436
-
$
TOTAL IMPLEMENTED Savings:
$39,454
Cost:
$8,067
$2,905 60,668 $1,413 83 $35,136 - $2,905
60,668
kWh
$1,413
83
kW-months/year
$35,136
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes