IAC logo
IAC Assessment: SD0202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Custom printed circuit boards
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 78
Plant Area (Sq.Ft.) 20,000
Annual Production 15,600 Pieces
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,964 1,368,992 kWh $0.08
Electricity Demand $49,490 3,077 kW-months/year $16.08
Natural Gas $10,453 1,371 MMBtu $7.62
TOTAL ENERGY COSTS $175,907
RECOMMENDED SAVINGS* $348,949 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,170
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,974
Cost:
$2,150
$4,044 47,479 $2,165 135 $(-1,235) (-162) - - - - - - $4,044
47,479
kWh
$2,165
135
kW-months/year
$(-1,235)
(-162)
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,368
Cost:
$9,111
$3,181 932,298 $2,187 136 - - - - - - - - $3,181
932,298
kWh
$2,187
136
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,044
Cost:
$3,060
$2,238 655,920 $1,806 113 - - - - - - - - $2,238
655,920
kWh
$1,806
113
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$616
Cost:
$1,020
$616 12,896 - - - - - - - - - - $616
12,896
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$678
Cost:
$800
$272 5,569 $406 25 - - - - - - - - $272
5,569
kWh
$406
25
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$6,118
Cost:
$3,035
- - - - $6,118 280 - - - - - - -
-
kWh
-
-
kW-months/year
$6,118
280
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$604
Cost:
$1,154
- - - - $604 3 - - - - - - -
-
kWh
-
-
kW-months/year
$604
3
MMBtu
-
-
lb
-
-
$
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,456
Cost:
-
- - - - - - $1,456 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,456
-
lb
-
-
$
-
-
$
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$8,736
Cost:
$2,000
- - - - - - $8,736 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,736
-
lb
-
-
$
-
-
$
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$3,190
Cost:
$2,000
- - - - - - - - $3,190 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$3,190
-
$
-
-
$
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,420
Cost:
$500
- - - - - - $1,420 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,420
-
lb
-
-
$
-
-
$
12: 3.1152 USE HIGH QUALITY SCRAP (LOW SULFUR) TO REDUCE HAZARDOUS SLUDGE GENERATION Savings:
$3,394
Cost:
$3,000
- - - - - - $3,394 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,394
-
lb
-
-
$
-
-
$
13: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$308,351
Cost:
$900,000
- - - - - - - - - - $308,351 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$308,351
-
$
TOTAL RECOMMENDED Savings:
$348,949
Cost:
$927,830
$10,351 1,654,162 $6,564 409 $5,487 121 $15,006 - $3,190 - $308,351 - $10,351
1,654,162
kWh
$6,564
409
kW-months/year
$5,487
121
MMBtu
$15,006
-
lb
$3,190
-
$
$308,351
-
$
TOTAL IMPLEMENTED Savings:
$20,170
Cost:
$13,611
$3,181 932,298 $2,187 136 - - $11,612 - $3,190 - - - $3,181
932,298
kWh
$2,187
136
kW-months/year
-
-
MMBtu
$11,612
-
lb
$3,190
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Product