Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1999 |
Principal Product | Heat sinks and golf club inserts |
NAICS | n/a |
SIC | 3674 - Semiconductors And Related Devices |
Sales | $10,000,000-$50,000,000 |
# of Employees | 205 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 130,000 Pounds |
Production Hrs. Annual | 7,956 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $103,568 | 3,084,994 | kWh | $0.03 |
Electricity Demand | $54,590 | 5,295 | kW-months/year | $10.31 |
Electricity Fees | $6,212 | - | $ | - |
Natural Gas | $3,332 | 436 | MMBtu | $7.64 |
TOTAL ENERGY COSTS | $172,080 | |||
RECOMMENDED SAVINGS* | $536,775 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,635 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $3,652 Cost: $3,480 |
$2,169 | 64,771 | $1,483 | 140 | - | - | - | - | - | - |
$2,169 64,771 kWh |
$1,483 140 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,635 Cost: $6,257 |
$1,585 | 47,186 | $1,050 | 102 | - | - | - | - | - | - |
$1,585 47,186 kWh |
$1,050 102 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,080 Cost: $906 |
$1,080 | 32,239 | - | - | - | - | - | - | - | - |
$1,080 32,239 kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7314 REDUCE VENTILATION AIR |
Savings: $2,763 Cost: $1,600 |
$1,795 | 53,341 | $968 | 94 | - | - | - | - | - | - |
$1,795 53,341 kWh |
$968 94 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $1,153 Cost: $3,000 |
- | - | - | - | - | - | $1,153 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$1,153 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,300 Cost: $7,000 |
- | - | - | - | - | - | $5,300 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$5,300 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $13,012 Cost: - |
- | - | - | - | $13,012 | 650 | - | - | - | - |
- - kWh |
- - kW-months/year |
$13,012 650 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $507,180 Cost: $5,000 |
- | - | - | - | - | - | - | - | $507,180 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$507,180 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $536,775 Cost: $27,243 |
$6,629 | 197,537 | $3,501 | 336 | $13,012 | 650 | $6,453 | - | $507,180 | - | $6,629 197,537 kWh |
$3,501 336 kW-months/year |
$13,012 650 gal |
$6,453 - lb |
$507,180 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,635 Cost: $6,257 |
$1,585 | 47,186 | $1,050 | 102 | - | - | - | - | - | - | $1,585 47,186 kWh |
$1,050 102 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |