IAC logo
IAC Assessment: SD0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product metal plating
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $5,000,000-$10,000,000
# of Employees 78
Plant Area (Sq.Ft.) 0
Annual Production 48,000 Pieces
Production Hrs. Annual 6,732
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $205,062 2,948,124 kWh $0.07
Electricity Demand $61,509 7,742 kW-months/year $7.94
Natural Gas $13,252 2,094 MMBtu $6.33
TOTAL ENERGY COSTS $318,587
RECOMMENDED SAVINGS* $157,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,078
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,277
Cost:
$1,650
$843 12,016 $434 55 - - - - - - - - $843
12,016
kWh
$434
55
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,961
Cost:
$1,060
$9,906 142,438 $2,055 259 - - - - - - - - $9,906
142,438
kWh
$2,055
259
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$99,648
Cost:
$111,600
$107,328 1,542,497 $50,308 6,332 $(-57,988) (-9,161) - - - - - - $107,328
1,542,497
kWh
$50,308
6,332
kW-months/year
$(-57,988)
(-9,161)
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$840
Cost:
-
- - - - - - - - - - $840 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$840
-
$
05: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$1,038
Cost:
$1,500
- - - - - - - - $1,038 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,038
-
lb
-
-
$
06: 3.8133 CONVERT TO AQUEOUS CLEANING Savings:
$6,009
Cost:
$6,009
- - - - - - $6,009 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,009
-
gal
-
-
lb
-
-
$
07: 4.446 AUTOMATE FINISHING PROCESS Savings:
$11,740
Cost:
$4,100
- - - - - - - - - - $11,740 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$11,740
-
$
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$25,245
Cost:
$22,970
- - - - - - - - - - $25,245 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$25,245
-
$
TOTAL RECOMMENDED Savings:
$157,758
Cost:
$148,889
$118,077 1,696,951 $52,797 6,646 $(-57,988) (-9,161) $6,009 - $1,038 - $37,825 - $118,077
1,696,951
kWh
$52,797
6,646
kW-months/year
$(-57,988)
(-9,161)
MMBtu
$6,009
-
gal
$1,038
-
lb
$37,825
-
$
TOTAL IMPLEMENTED Savings:
$14,078
Cost:
$2,710
$10,749 154,454 $2,489 314 - - - - - - $840 - $10,749
154,454
kWh
$2,489
314
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$840
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes