Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1999 |
Principal Product | electronic enclosures |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 2,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $44,212 | 608,148 | kWh | $0.07 |
Electricity Demand | $12,039 | 2,031 | kW-months/year | $5.93 |
Electricity Fees | $3,465 | - | $ | - |
Natural Gas | $6,947 | 2,383 | MMBtu | $2.92 |
TOTAL ENERGY COSTS | $68,817 | |||
RECOMMENDED SAVINGS* | $206,416 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $163,290 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $1,485 Cost: $1,420 |
$1,148 | 15,826 | $337 | 57 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$1,148 15,826 kWh |
$337 57 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $953 Cost: $2,268 |
$733 | 9,965 | $220 | 37 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$733 9,965 kWh |
$220 37 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,351 Cost: $300 |
$2,692 | 36,928 | $659 | 111 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$2,692 36,928 kWh |
$659 111 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,614 Cost: $500 |
$4,901 | 67,409 | $1,713 | 289 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$4,901 67,409 kWh |
$1,713 289 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,938 Cost: $3,800 |
- | - | - | - | $1,938 | 668 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,938 668 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7145 INSTALL SKYLIGHTS |
Savings: $520 Cost: $1,380 |
$349 | 4,689 | $171 | 29 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$349 4,689 kWh |
$171 29 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $6,059 Cost: $1,000 |
- | - | - | - | $4,897 | 1,687 | - | - | - | - | - | - | - | - | $1,162 | - | - | - |
- - kWh |
- - kW-months/year |
$4,897 1,687 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
$1,162 - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,136 Cost: $400 |
$2,332 | 32,239 | $804 | 138 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$2,332 32,239 kWh |
$804 138 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $9,689 Cost: $1,195 |
$9,689 | 979,191 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$9,689 979,191 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,680 Cost: - |
- | - | - | - | - | - | - | - | $1,680 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$1,680 - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $147,960 Cost: $10,000 |
- | - | - | - | - | - | $75,960 | 3,600 | - | - | - | - | $72,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$75,960 3,600 gal |
- - lb |
- - $ |
$72,000 - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $4,000 Cost: $8,000 |
- | - | - | - | - | - | - | - | - | - | $4,000 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$4,000 - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $12,000 Cost: $21,920 |
- | - | - | - | - | - | - | - | - | - | $12,000 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$12,000 - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,451 Cost: - |
- | - | - | - | - | - | - | - | - | - | $967 | - | - | - | - | - | $484 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$967 - $ |
- - $ |
- - Tgal |
$484 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $5,580 Cost: - |
- | - | - | - | - | - | - | - | - | - | $3,720 | - | - | - | - | - | $1,860 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$3,720 - $ |
- - $ |
- - Tgal |
$1,860 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $206,416 Cost: $52,183 |
$21,844 | 1,146,247 | $3,904 | 661 | $6,835 | 2,355 | $75,960 | 3,600 | $1,680 | - | $20,687 | - | $72,000 | - | $1,162 | - | $2,344 | - | $21,844 1,146,247 kWh |
$3,904 661 kW-months/year |
$6,835 2,355 MMBtu |
$75,960 3,600 gal |
$1,680 - lb |
$20,687 - $ |
$72,000 - $ |
$1,162 - Tgal |
$2,344 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $163,290 Cost: $10,900 |
$7,233 | 99,648 | $2,517 | 427 | - | - | $75,960 | 3,600 | - | - | $3,720 | - | $72,000 | - | - | - | $1,860 | - | $7,233 99,648 kWh |
$2,517 427 kW-months/year |
- - MMBtu |
$75,960 3,600 gal |
- - lb |
$3,720 - $ |
$72,000 - $ |
- - Tgal |
$1,860 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | One-time Revenue or Avoided Cost |