Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1999 |
Principal Product | Heat Exchangers |
NAICS | n/a |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 4,676 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $178,393 | 2,652,403 | kWh | $0.07 |
Electricity Demand | $42,948 | 5,816 | kW-months/year | $7.38 |
Natural Gas | $10,883 | 1,799 | MMBtu | $6.05 |
TOTAL ENERGY COSTS | $236,081 | |||
RECOMMENDED SAVINGS* | $155,041 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $99,069 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,040 Cost: $5,528 |
$8,721 | 129,543 | $2,319 | 314 | - | - | - | - |
$8,721 129,543 kWh |
$2,319 314 kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,440 Cost: $500 |
$2,564 | 38,101 | $876 | 119 | - | - | - | - |
$2,564 38,101 kWh |
$876 119 kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $55,972 Cost: $80,000 |
$48,393 | 719,226 | $7,579 | 1,027 | - | - | - | - |
$48,393 719,226 kWh |
$7,579 1,027 kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $17,838 Cost: $732 |
- | - | - | - | $17,838 | 600 | - | - |
- - kWh |
- - kW-months/year |
$17,838 600 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.8133 CONVERT TO AQUEOUS CLEANING |
Savings: $7,548 Cost: - |
- | - | - | - | $7,548 | 660 | - | - |
- - kWh |
- - kW-months/year |
$7,548 660 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $7,710 Cost: $8,500 |
- | - | - | - | - | - | $7,710 | - |
- - kWh |
- - kW-months/year |
- - gal |
$7,710 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
Savings: $51,493 Cost: $8,000 |
$45,547 | 677,022 | $5,946 | 805 | - | - | - | - |
$45,547 677,022 kWh |
$5,946 805 kW-months/year |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $155,041 Cost: $103,260 |
$105,225 | 1,563,892 | $16,720 | 2,265 | $25,386 | 1,260 | $7,710 | - | $105,225 1,563,892 kWh |
$16,720 2,265 kW-months/year |
$25,386 1,260 gal |
$7,710 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $99,069 Cost: $23,260 |
$56,832 | 844,666 | $9,141 | 1,238 | $25,386 | 1,260 | $7,710 | - | $56,832 844,666 kWh |
$9,141 1,238 kW-months/year |
$25,386 1,260 gal |
$7,710 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) |