IAC logo
IAC Assessment: SD0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product coated steel
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $50,000,000-$100,000,000
# of Employees 155
Plant Area (Sq.Ft.) 270,000
Annual Production 200,000 Tons
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,334,868 28,604,045 kWh $0.05
Electricity Demand $671,952 69,693 kW-months/year $9.64
Natural Gas $1,141,365 423,018 MMBtu $2.70
TOTAL ENERGY COSTS $3,180,772
RECOMMENDED SAVINGS* $1,513,159 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $113,970
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,090
Cost:
$4,048
$2,629 58,324 $461 48 - - - - - - $2,629
58,324
kWh
$461
48
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,483
Cost:
$6,030
$1,360 29,015 $1,123 117 - - - - - - $1,360
29,015
kWh
$1,123
117
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$257,414
Cost:
$480,000
$193,096 3,505,862 $64,318 6,672 - - - - - - $193,096
3,505,862
kWh
$64,318
6,672
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$1,099,432
Cost:
$1,975,633
$813,751 17,429,953 $285,681 29,635 - - - - - - $813,751
17,429,953
kWh
$285,681
29,635
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$83,680
Cost:
-
- - - - $83,680 18,191 - - - - -
-
kWh
-
-
kW-months/year
$83,680
18,191
gal
-
-
lb
-
-
$
06: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$39,860
Cost:
$16,000
- - - - - - $39,860 600,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$39,860
600,000
lb
-
-
$
07: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$27,200
Cost:
-
- - - - - - - - $27,200 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$27,200
-
$
08: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
-
Cost:
$2,410
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$1,513,159
Cost:
$2,484,121
$1,010,836 21,023,154 $351,583 36,472 $83,680 18,191 $39,860 600,000 $27,200 - $1,010,836
21,023,154
kWh
$351,583
36,472
kW-months/year
$83,680
18,191
gal
$39,860
600,000
lb
$27,200
-
$
TOTAL IMPLEMENTED Savings:
$113,970
Cost:
$6,458
$2,629 58,324 $461 48 $83,680 18,191 - - $27,200 - $2,629
58,324
kWh
$461
48
kW-months/year
$83,680
18,191
gal
-
-
lb
$27,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Administrative Changes