IAC logo
IAC Assessment: SD0234
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0234
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product Medical devices for surgery
NAICS n/a
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 315
Plant Area (Sq.Ft.) 57,000
Annual Production 0 Units
Production Hrs. Annual 4,125
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,449 1,091,149 kWh $0.08
Electricity Demand $34,940 2,405 kW-months/year $14.53
TOTAL ENERGY COSTS $121,389
RECOMMENDED SAVINGS* $189,154 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,069
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,609
Cost:
$25,688
$13,552 171,161 $6,057 417 - - - - - - $13,552
171,161
kWh
$6,057
417
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$26,750
Cost:
$21,265
$18,486 233,294 $8,264 569 - - - - - - $18,486
233,294
kWh
$8,264
569
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$6,768
Cost:
$13,000
$4,458 56,272 $2,310 159 - - - - - - $4,458
56,272
kWh
$2,310
159
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,069
Cost:
$1,425
$558 7,034 $511 35 - - - - - - $558
7,034
kWh
$511
35
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,471
Cost:
$7,825
$1,625 20,516 $846 58 - - - - - - $1,625
20,516
kWh
$846
58
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,739
Cost:
$3,334
$2,281 28,722 $2,511 173 $(-1,053) (-140) - - - - $2,281
28,722
kWh
$2,511
173
kW-months/year
$(-1,053)
(-140)
MMBtu
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$151
Cost:
-
$41 586 $110 8 - - - - - - $41
586
kWh
$110
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$8,640
Cost:
$510
- - - - - - - - $8,640 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$8,640
-
$
09: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$119,957
Cost:
$150,000
- - - - - - $119,957 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$119,957
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$189,154
Cost:
$223,047
$41,001 517,585 $20,609 1,419 $(-1,053) (-140) $119,957 - $8,640 - $41,001
517,585
kWh
$20,609
1,419
kW-months/year
$(-1,053)
(-140)
MMBtu
$119,957
-
$
$8,640
-
$
TOTAL IMPLEMENTED Savings:
$1,069
Cost:
$1,425
$558 7,034 $511 35 - - - - - - $558
7,034
kWh
$511
35
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material