Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | Aggregates and Asphalt |
NAICS | n/a |
SIC | 2951 - Asphalt Paving Mixtures And Blocks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 280,000 |
Annual Production | 1,400,000 Tons |
Production Hrs. Annual | 7,200 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $471,610 | 8,940,797 | kWh | $0.05 |
Electricity Demand | $152,034 | 33,312 | kW-months/year | $4.56 |
Electricity Fees | $4,176 | - | $ | - |
Natural Gas | $190,848 | 94,524 | MMBtu | $2.02 |
TOTAL ENERGY COSTS | $818,668 | |||
RECOMMENDED SAVINGS* | $318,686 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $272,611 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $11,527 Cost: $8,000 |
$9,980 | 189,039 | $3,280 | 720 | $(-1,733) | (-806) |
$9,980 189,039 kWh |
$3,280 720 kW-months/year |
$(-1,733) (-806) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $271,210 Cost: $1,150,000 |
$357,142 | 5,881,594 | $76,608 | 16,800 | $(-162,540) | (-75,600) |
$357,142 5,881,594 kWh |
$76,608 16,800 kW-months/year |
$(-162,540) (-75,600) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,260 Cost: $17,300 |
$4,219 | 80,012 | $1,041 | 228 | - | - |
$4,219 80,012 kWh |
$1,041 228 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $862 Cost: $388 |
$682 | 12,896 | $180 | 39 | - | - |
$682 12,896 kWh |
$180 39 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $539 Cost: - |
$342 | 6,448 | $197 | 43 | - | - |
$342 6,448 kWh |
$197 43 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
Savings: $29,288 Cost: - |
$13,624 | 258,206 | $3,361 | 737 | $12,303 | 5,722 |
$13,624 258,206 kWh |
$3,361 737 kW-months/year |
$12,303 5,722 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $318,686 Cost: $1,175,688 |
$385,989 | 6,428,195 | $84,667 | 18,567 | $(-151,970) | (-70,684) | $385,989 6,428,195 kWh |
$84,667 18,567 kW-months/year |
$(-151,970) (-70,684) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $272,611 Cost: $1,150,388 |
$358,166 | 5,900,938 | $76,985 | 16,882 | $(-162,540) | (-75,600) | $358,166 5,900,938 kWh |
$76,985 16,882 kW-months/year |
$(-162,540) (-75,600) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |