IAC logo
IAC Assessment: SD0236
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0236
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product Aggregates and Asphalt
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 280,000
Annual Production 1,400,000 Tons
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $471,610 8,940,797 kWh $0.05
Electricity Demand $152,034 33,312 kW-months/year $4.56
Electricity Fees $4,176 - $ -
Natural Gas $190,848 94,524 MMBtu $2.02
TOTAL ENERGY COSTS $818,668
RECOMMENDED SAVINGS* $318,686 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $272,611
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$11,527
Cost:
$8,000
$9,980 189,039 $3,280 720 $(-1,733) (-806) $9,980
189,039
kWh
$3,280
720
kW-months/year
$(-1,733)
(-806)
MMBtu
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$271,210
Cost:
$1,150,000
$357,142 5,881,594 $76,608 16,800 $(-162,540) (-75,600) $357,142
5,881,594
kWh
$76,608
16,800
kW-months/year
$(-162,540)
(-75,600)
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,260
Cost:
$17,300
$4,219 80,012 $1,041 228 - - $4,219
80,012
kWh
$1,041
228
kW-months/year
-
-
MMBtu
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$862
Cost:
$388
$682 12,896 $180 39 - - $682
12,896
kWh
$180
39
kW-months/year
-
-
MMBtu
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$539
Cost:
-
$342 6,448 $197 43 - - $342
6,448
kWh
$197
43
kW-months/year
-
-
MMBtu
06: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$29,288
Cost:
-
$13,624 258,206 $3,361 737 $12,303 5,722 $13,624
258,206
kWh
$3,361
737
kW-months/year
$12,303
5,722
MMBtu
TOTAL RECOMMENDED Savings:
$318,686
Cost:
$1,175,688
$385,989 6,428,195 $84,667 18,567 $(-151,970) (-70,684) $385,989
6,428,195
kWh
$84,667
18,567
kW-months/year
$(-151,970)
(-70,684)
MMBtu
TOTAL IMPLEMENTED Savings:
$272,611
Cost:
$1,150,388
$358,166 5,900,938 $76,985 16,882 $(-162,540) (-75,600) $358,166
5,900,938
kWh
$76,985
16,882
kW-months/year
$(-162,540)
(-75,600)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas