Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | Wine |
NAICS | n/a |
SIC | 2084 - Wines, Brandy, And Brandy Spirits |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 350,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $81,249 | 1,105,510 | kWh | $0.07 |
Electricity Demand | $33,702 | 3,383 | kW-months/year | $9.96 |
Electricity Fees | $844 | - | $ | - |
Natural Gas | $9,654 | 1,948 | MMBtu | $4.96 |
TOTAL ENERGY COSTS | $137,687 | |||
RECOMMENDED SAVINGS* | $108,966 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $73,699 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $28,985 Cost: $88,000 |
$48,030 | 651,817 | $8,084 | 895 | $(-27,129) | (-5,559) | - | - | - | - | - | - |
$48,030 651,817 kWh |
$8,084 895 kW-months/year |
$(-27,129) (-5,559) MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,408 Cost: $2,800 |
$2,214 | 30,188 | $194 | 22 | - | - | - | - | - | - | - | - |
$2,214 30,188 kWh |
$194 22 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $688 Cost: $100 |
- | - | - | - | $688 | 123 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$688 123 MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,766 Cost: $9,903 |
$2,539 | 34,584 | $1,227 | 136 | - | - | - | - | - | - | - | - |
$2,539 34,584 kWh |
$1,227 136 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $4,525 Cost: $6,910 |
$3,072 | 41,618 | $1,453 | 161 | - | - | - | - | - | - | - | - |
$3,072 41,618 kWh |
$1,453 161 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $6,740 Cost: $8,500 |
- | - | - | - | - | - | - | - | $6,740 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$6,740 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4151 MINIMIZE WATER USAGE |
Savings: $646 Cost: $100 |
- | - | - | - | - | - | - | - | - | - | $646 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$646 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $40,972 Cost: $7,200 |
- | - | - | - | - | - | $40,972 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$40,972 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $20,236 Cost: $26,000 |
- | - | - | - | - | - | $20,236 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$20,236 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $108,966 Cost: $149,513 |
$55,855 | 758,207 | $10,958 | 1,214 | $(-26,441) | (-5,436) | $61,208 | - | $6,740 | - | $646 | - | $55,855 758,207 kWh |
$10,958 1,214 kW-months/year |
$(-26,441) (-5,436) MMBtu |
$61,208 - $ |
$6,740 - $ |
$646 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $73,699 Cost: $98,200 |
$50,244 | 682,005 | $8,278 | 917 | $(-26,441) | (-5,436) | $40,972 | - | - | - | $646 | - | $50,244 682,005 kWh |
$8,278 917 kW-months/year |
$(-26,441) (-5,436) MMBtu |
$40,972 - $ |
- - $ |
$646 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Water Consumption |