IAC Assessment: SD0240
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0240
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product Plastic containers
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 170,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $514,895 22,228,019 kWh $0.02
Electricity Demand $398,845 40,379 kW-months/year $9.88
Electricity Fees $5,760 - $ -
TOTAL ENERGY COSTS $928,272
RECOMMENDED SAVINGS* $174,879 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $122,463
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$114,651
Cost:
$214,102
$72,098 3,135,405 $42,553 4,307 - - $72,098
3,135,405
kWh
$42,553
4,307
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,067
Cost:
$2,600
$826 35,756 $241 24 - - $826
35,756
kWh
$241
24
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$193
Cost:
$714
$122 5,275 $71 7 - - $122
5,275
kWh
$71
7
kW-months/year
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$52,416
Cost:
$31,000
- - - - $52,416 - -
-
kWh
-
-
kW-months/year
$52,416
-
$
05: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$6,552
Cost:
$6,000
- - - - $6,552 - -
-
kWh
-
-
kW-months/year
$6,552
-
$
TOTAL RECOMMENDED Savings:
$174,879
Cost:
$254,416
$73,046 3,176,436 $42,865 4,338 $58,968 - $73,046
3,176,436
kWh
$42,865
4,338
kW-months/year
$58,968
-
$
TOTAL IMPLEMENTED Savings:
$122,463
Cost:
$223,416
$73,046 3,176,436 $42,865 4,338 $6,552 - $73,046
3,176,436
kWh
$42,865
4,338
kW-months/year
$6,552
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes