Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | Engine parts |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 103,800 |
Annual Production | 125,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $113,330 | 2,051,290 | kWh | $0.06 |
Electricity Demand | $93,583 | 7,303 | kW-months/year | $12.81 |
TOTAL ENERGY COSTS | $206,913 | |||
RECOMMENDED SAVINGS* | $91,477 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,835 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $14,399 Cost: $1,960 |
$5,176 | 93,600 | $9,223 | 720 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,176 93,600 kWh |
$9,223 720 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $14,283 Cost: $3,000 |
$11,916 | 215,416 | $9,992 | 780 | $(-7,625) | (-1,050) | - | - | - | - | - | - | - | - | - | - |
$11,916 215,416 kWh |
$9,992 780 kW-months/year |
$(-7,625) (-1,050) MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $4,568 Cost: - |
- | - | - | - | - | - | - | - | - | - | $4,568 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$4,568 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,903 Cost: - |
$1,001 | 18,171 | $902 | 70 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,001 18,171 kWh |
$902 70 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $42,700 Cost: $58,000 |
- | - | - | - | - | - | $2,700 | 1,200 | - | - | - | - | $40,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,700 1,200 gal |
- - lb |
- - $ |
$40,000 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM |
Savings: $8,347 Cost: - |
- | - | - | - | - | - | $2,700 | 1,200 | - | - | $5,647 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,700 1,200 gal |
- - lb |
$5,647 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,533 Cost: $8,500 |
- | - | - | - | - | - | - | - | - | - | $2,533 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$2,533 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5131 RECYCLE WHITE WATER |
Savings: $313 Cost: $400 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $313 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
$313 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.221 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY |
Savings: $2,431 Cost: $3,294 |
- | - | - | - | - | - | - | - | $351 | 520 | $2,080 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$351 520 lb |
$2,080 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $91,477 Cost: $75,154 |
$18,093 | 327,187 | $20,117 | 1,570 | $(-7,625) | (-1,050) | $5,400 | 2,400 | $351 | 520 | $14,828 | - | $40,000 | - | $313 | - | $18,093 327,187 kWh |
$20,117 1,570 kW-months/year |
$(-7,625) (-1,050) MMBtu |
$5,400 2,400 gal |
$351 520 lb |
$14,828 - $ |
$40,000 - $ |
$313 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,835 Cost: $10,460 |
$6,177 | 111,771 | $10,125 | 790 | - | - | - | - | - | - | $2,533 | - | - | - | - | - | $6,177 111,771 kWh |
$10,125 790 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$2,533 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Water Consumption |