IAC Assessment: SD0242
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0242
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product Engine parts
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 103,800
Annual Production 125,000 Pieces
Production Hrs. Annual 4,420
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,330 2,051,290 kWh $0.06
Electricity Demand $93,583 7,303 kW-months/year $12.81
TOTAL ENERGY COSTS $206,913
RECOMMENDED SAVINGS* $91,477 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,835
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ Tgal
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$14,399
Cost:
$1,960
$5,176 93,600 $9,223 720 - - - - - - - - - - - - $5,176
93,600
kWh
$9,223
720
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,283
Cost:
$3,000
$11,916 215,416 $9,992 780 $(-7,625) (-1,050) - - - - - - - - - - $11,916
215,416
kWh
$9,992
780
kW-months/year
$(-7,625)
(-1,050)
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,568
Cost:
-
- - - - - - - - - - $4,568 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$4,568
-
$
-
-
$
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,903
Cost:
-
$1,001 18,171 $902 70 - - - - - - - - - - - - $1,001
18,171
kWh
$902
70
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$42,700
Cost:
$58,000
- - - - - - $2,700 1,200 - - - - $40,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,700
1,200
gal
-
-
lb
-
-
$
$40,000
-
$
-
-
Tgal
06: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM Savings:
$8,347
Cost:
-
- - - - - - $2,700 1,200 - - $5,647 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,700
1,200
gal
-
-
lb
$5,647
-
$
-
-
$
-
-
Tgal
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,533
Cost:
$8,500
- - - - - - - - - - $2,533 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$2,533
-
$
-
-
$
-
-
Tgal
08: 3.5131 RECYCLE WHITE WATER Savings:
$313
Cost:
$400
- - - - - - - - - - - - - - $313 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
$313
-
Tgal
09: 4.2210 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY Savings:
$2,431
Cost:
$3,294
- - - - - - - - $351 520 $2,080 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$351
520
lb
$2,080
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$91,477
Cost:
$75,154
$18,093 327,187 $20,117 1,570 $(-7,625) (-1,050) $5,400 2,400 $351 520 $14,828 - $40,000 - $313 - $18,093
327,187
kWh
$20,117
1,570
kW-months/year
$(-7,625)
(-1,050)
MMBtu
$5,400
2,400
gal
$351
520
lb
$14,828
-
$
$40,000
-
$
$313
-
Tgal
TOTAL IMPLEMENTED Savings:
$18,835
Cost:
$10,460
$6,177 111,771 $10,125 790 - - - - - - $2,533 - - - - - $6,177
111,771
kWh
$10,125
790
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$2,533
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption