Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | instant shelters |
NAICS | n/a |
SIC | 2394 - Canvas And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 114,000 |
Annual Production | 380,000 Pieces |
Production Hrs. Annual | 2,717 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $68,443 | 607,268 | kWh | $0.11 |
Electricity Fees | $168 | - | $ | - |
Natural Gas | $3,894 | 633 | MMBtu | $6.15 |
TOTAL ENERGY COSTS | $72,505 | |||
RECOMMENDED SAVINGS* | $212,356 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $137,385 |
#|Description |
Savings Cost |
Status | Electricity Usage | Personnel Changes | Administrative Changes | Electricity Usage | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,493 Cost: $9,500 |
$5,493 | 48,652 | - | - | - | - |
$5,493 48,652 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,164 Cost: $8,784 |
$4,164 | 36,928 | - | - | - | - |
$4,164 36,928 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,481 Cost: $600 |
$1,481 | 13,189 | - | - | - | - |
$1,481 13,189 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $977 Cost: - |
$977 | 8,792 | - | - | - | - |
$977 8,792 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $136,408 Cost: $57,000 |
- | - | $136,408 | - | - | - |
- - kWh |
$136,408 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $61,500 Cost: $103,000 |
- | - | - | - | $61,500 | - |
- - kWh |
- - $ |
$61,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.632 CHANGE OPERATING CONDITIONS |
Savings: $2,333 Cost: - |
- | - | - | - | $2,333 | - |
- - kWh |
- - $ |
$2,333 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $212,356 Cost: $178,884 |
$12,115 | 107,561 | $136,408 | - | $63,833 | - | $12,115 107,561 kWh |
$136,408 - $ |
$63,833 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $137,385 Cost: $57,000 |
$977 | 8,792 | $136,408 | - | - | - | $977 8,792 kWh |
$136,408 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Personnel Changes | Administrative Changes | Electricity Usage | Personnel Changes | Administrative Changes |