IAC Assessment: SD0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product aluminum extrusion for automobile industry
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $50,000,000-$100,000,000
# of Employees 275
Plant Area (Sq.Ft.) 166,000
Annual Production 25,000 Tons
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $770,297 17,065,065 kWh $0.05
Electricity Demand $303,661 29,561 kW-months/year $10.27
Electricity Fees $3,588 - $ -
Natural Gas $1,366,819 411,809 MMBtu $3.32
TOTAL ENERGY COSTS $2,444,365
RECOMMENDED SAVINGS* $521,907 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $313,479
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$18,038
Cost:
$27,000
$7,259 160,610 $10,779 1,050 - - - - - - $7,259
160,610
kWh
$10,779
1,050
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,703
Cost:
$7,230
$3,967 87,925 $736 72 - - - - - - $3,967
87,925
kWh
$736
72
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$205,696
Cost:
$64,500
- - - - $205,696 62,904 - - - - -
-
kWh
-
-
kW-months/year
$205,696
62,904
MMBtu
-
-
lb
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,732
Cost:
$5,400
- - - - - - $2,732 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,732
-
lb
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$290,738
Cost:
-
- - - - - - - - $290,738 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$290,738
-
$
TOTAL RECOMMENDED Savings:
$521,907
Cost:
$104,130
$11,226 248,535 $11,515 1,122 $205,696 62,904 $2,732 - $290,738 - $11,226
248,535
kWh
$11,515
1,122
kW-months/year
$205,696
62,904
MMBtu
$2,732
-
lb
$290,738
-
$
TOTAL IMPLEMENTED Savings:
$313,479
Cost:
$34,230
$11,226 248,535 $11,515 1,122 - - - - $290,738 - $11,226
248,535
kWh
$11,515
1,122
kW-months/year
-
-
MMBtu
-
-
lb
$290,738
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost