Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | aluminum extrusion for automobile industry |
NAICS | n/a |
SIC | 3354 - Aluminum Extruded Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 275 |
Plant Area (Sq.Ft.) | 166,000 |
Annual Production | 25,000 Tons |
Production Hrs. Annual | 6,120 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $770,297 | 17,065,065 | kWh | $0.05 |
Electricity Demand | $303,661 | 29,561 | kW-months/year | $10.27 |
Electricity Fees | $3,588 | - | $ | - |
Natural Gas | $1,366,819 | 411,809 | MMBtu | $3.32 |
TOTAL ENERGY COSTS | $2,444,365 | |||
RECOMMENDED SAVINGS* | $521,907 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $313,479 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7145 INSTALL SKYLIGHTS |
Savings: $18,038 Cost: $27,000 |
$7,259 | 160,610 | $10,779 | 1,050 | - | - | - | - | - | - |
$7,259 160,610 kWh |
$10,779 1,050 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,703 Cost: $7,230 |
$3,967 | 87,925 | $736 | 72 | - | - | - | - | - | - |
$3,967 87,925 kWh |
$736 72 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $205,696 Cost: $64,500 |
- | - | - | - | $205,696 | 62,904 | - | - | - | - |
- - kWh |
- - kW-months/year |
$205,696 62,904 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,732 Cost: $5,400 |
- | - | - | - | - | - | $2,732 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,732 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $290,738 Cost: - |
- | - | - | - | - | - | - | - | $290,738 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$290,738 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $521,907 Cost: $104,130 |
$11,226 | 248,535 | $11,515 | 1,122 | $205,696 | 62,904 | $2,732 | - | $290,738 | - | $11,226 248,535 kWh |
$11,515 1,122 kW-months/year |
$205,696 62,904 MMBtu |
$2,732 - lb |
$290,738 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $313,479 Cost: $34,230 |
$11,226 | 248,535 | $11,515 | 1,122 | - | - | - | - | $290,738 | - | $11,226 248,535 kWh |
$11,515 1,122 kW-months/year |
- - MMBtu |
- - lb |
$290,738 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost |