Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | ceramic materials for military and automobiles |
NAICS | n/a |
SIC | 3295 - Minerals, Ground Or Treated |
Sales | $10,000,000-$50,000,000 |
# of Employees | 230 |
Plant Area (Sq.Ft.) | 217,000 |
Annual Production | 4,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $399,477 | 7,961,606 | kWh | $0.05 |
Electricity Demand | $215,507 | 25,326 | kW-months/year | $8.51 |
Electricity Fees | $10,444 | - | $ | - |
Natural Gas | $33,288 | 6,442 | MMBtu | $5.17 |
TOTAL ENERGY COSTS | $671,937 | |||
RECOMMENDED SAVINGS* | $155,133 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $122,937 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $32,196 Cost: $16,750 |
$21,280 | 424,091 | $19,709 | 2,316 | $(-8,793) | (-1,702) | - | - | - | - | - | - | - | - |
$21,280 424,091 kWh |
$19,709 2,316 kW-months/year |
$(-8,793) (-1,702) MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $21,676 Cost: $27,000 |
$15,089 | 301,583 | $6,587 | 774 | - | - | - | - | - | - | - | - | - | - |
$15,089 301,583 kWh |
$6,587 774 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,428 Cost: $6,300 |
$3,002 | 59,789 | $426 | 50 | - | - | - | - | - | - | - | - | - | - |
$3,002 59,789 kWh |
$426 50 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,271 Cost: $3,000 |
$5,271 | 104,924 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,271 104,924 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $3,428 Cost: $5,400 |
- | - | - | - | - | - | - | - | - | - | $3,428 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$3,428 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE |
Savings: $2,345 Cost: - |
- | - | - | - | - | - | - | - | $2,345 | 1,268 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,345 1,268 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $7,795 Cost: $2,000 |
- | - | - | - | - | - | $7,795 | 5,100,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,795 5,100,000 Tgal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $11,760 Cost: - |
- | - | $11,760 | 350 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$11,760 350 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $67,234 Cost: $55,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $67,234 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$67,234 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $155,133 Cost: $115,450 |
$44,642 | 890,387 | $38,482 | 3,490 | $(-8,793) | (-1,702) | $7,795 | 5,100,000 | $2,345 | 1,268 | $3,428 | - | $67,234 | - | $44,642 890,387 kWh |
$38,482 3,490 kW-months/year |
$(-8,793) (-1,702) MMBtu |
$7,795 5,100,000 Tgal |
$2,345 1,268 gal |
$3,428 - lb |
$67,234 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $122,937 Cost: $98,700 |
$23,362 | 466,296 | $18,773 | 1,174 | - | - | $7,795 | 5,100,000 | $2,345 | 1,268 | $3,428 | - | $67,234 | - | $23,362 466,296 kWh |
$18,773 1,174 kW-months/year |
- - MMBtu |
$7,795 5,100,000 Tgal |
$2,345 1,268 gal |
$3,428 - lb |
$67,234 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes |