Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | seed dispersers |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 14,000,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $485,428 | 9,847,597 | kWh | $0.05 |
Electricity Demand | $226,499 | 17,094 | kW-months/year | $13.25 |
Electricity Fees | $2,084 | - | $ | - |
Natural Gas | $66,899 | 13,443 | MMBtu | $4.98 |
TOTAL ENERGY COSTS | $780,910 | |||
RECOMMENDED SAVINGS* | $800,191 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $309,118 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $139,359 Cost: $30,480 |
$100,317 | 2,039,566 | $39,042 | 2,856 | - | - | - | - | - | - | - | - |
$100,317 2,039,566 kWh |
$39,042 2,856 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $66,333 Cost: $50,000 |
$39,348 | 800,117 | $26,985 | 1,974 | - | - | - | - | - | - | - | - |
$39,348 800,117 kWh |
$26,985 1,974 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,169 Cost: $2,000 |
$1,626 | 33,118 | $3,543 | 259 | - | - | - | - | - | - | - | - |
$1,626 33,118 kWh |
$3,543 259 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,957 Cost: - |
- | - | $3,957 | 268 | - | - | - | - | - | - | - | - |
- - kWh |
$3,957 268 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $5,453 Cost: $8,250 |
- | - | - | - | $5,453 | 1,151 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,453 1,151 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $3,997 Cost: $12,500 |
- | - | - | - | - | - | $3,997 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,997 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,732 Cost: $7,900 |
- | - | - | - | - | - | $5,732 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,732 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $387,150 Cost: $250,000 |
- | - | - | - | - | - | - | - | $387,150 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$387,150 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $32,513 Cost: $20,000 |
- | - | - | - | - | - | - | - | $32,513 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$32,513 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $4,528 Cost: $3,294 |
- | - | - | - | - | - | - | - | $4,528 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$4,528 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $84,000 Cost: $40,000 |
- | - | - | - | - | - | - | - | - | - | $84,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$84,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $62,000 Cost: $20,000 |
- | - | - | - | - | - | - | - | $62,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$62,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $800,191 Cost: $444,424 |
$141,291 | 2,872,801 | $73,527 | 5,357 | $5,453 | 1,151 | $9,729 | - | $486,191 | - | $84,000 | - | $141,291 2,872,801 kWh |
$73,527 5,357 kW-months/year |
$5,453 1,151 MMBtu |
$9,729 - lb |
$486,191 - $ |
$84,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $309,118 Cost: $146,174 |
$141,291 | 2,872,801 | $69,570 | 5,089 | - | - | $9,729 | - | $4,528 | - | $84,000 | - | $141,291 2,872,801 kWh |
$69,570 5,089 kW-months/year |
- - MMBtu |
$9,729 - lb |
$4,528 - $ |
$84,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |