IAC logo
IAC Assessment: SD0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product metal parts for automobile industry
NAICS n/a
SIC 3399 - Primary Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 102
Plant Area (Sq.Ft.) 80,000
Annual Production 900 Tons
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,023 4,625,850 kWh $0.05
Electricity Demand $92,639 9,058 kW-months/year $10.23
Electricity Fees $3,588 - $ -
Natural Gas $31,720 5,525 MMBtu $5.74
TOTAL ENERGY COSTS $374,505
RECOMMENDED SAVINGS* $121,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $80,384
#|Description Savings
Cost
Status Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$4,061
Cost:
$10,250
- - $4,061 864 - - - - - - - - -
-
kW-months/year
$4,061
864
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,459
Cost:
$4,000
- - $4,459 900 - - - - - - - - -
-
kW-months/year
$4,459
900
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$17,320
Cost:
-
$12,600 1,500 - - - - - - - - $4,720 - $12,600
1,500
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$4,720
-
$
04: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$2,492
Cost:
-
$1,728 179 - - - - - - - - $764 - $1,728
179
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$764
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,500
Cost:
$7,900
- - - - - - - - $4,500 - - - -
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$4,500
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,850
Cost:
$2,100
- - - - - - - - $4,850 - - - -
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$4,850
-
$
-
-
$
07: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES Savings:
$8,708
Cost:
$15,000
- - - - $8,708 184 - - - - - - -
-
kW-months/year
-
-
MMBtu
$8,708
184
gal
-
-
$
-
-
$
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$59,514
Cost:
-
- - - - - - - - - - $59,514 - -
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$59,514
-
$
09: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$14,400
Cost:
$25,000
- - - - - - $14,400 - - - - - -
-
kW-months/year
-
-
MMBtu
-
-
gal
$14,400
-
$
-
-
$
-
-
$
10: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,058
Cost:
-
- - - - - - - - $1,058 - - - -
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$1,058
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$121,362
Cost:
$64,250
$14,328 1,679 $8,520 1,764 $8,708 184 $14,400 - $10,408 - $64,998 - $14,328
1,679
kW-months/year
$8,520
1,764
MMBtu
$8,708
184
gal
$14,400
-
$
$10,408
-
$
$64,998
-
$
TOTAL IMPLEMENTED Savings:
$80,384
Cost:
-
$14,328 1,679 - - - - - - $1,058 - $64,998 - $14,328
1,679
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$1,058
-
$
$64,998
-
$
Savings
Cost
$ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost