IAC logo
IAC Assessment: SD0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product Spas
NAICS n/a
SIC 3088 - Plastics Plumbing Fixtures
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 130,000
Annual Production 11,500 Pieces
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,392 1,495,500 kWh $0.11
Electricity Demand $48,905 5,354 kW-months/year $9.13
Electricity Fees $518 - $ -
Natural Gas $25,211 3,906 MMBtu $6.45
TOTAL ENERGY COSTS $241,890
RECOMMENDED SAVINGS* $88,870 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,255
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,376
Cost:
$20,000
$3,558 33,250 $3,835 420 $983 (-151) - - - - $3,558
33,250
kWh
$3,835
420
kW-months/year
$983
(-151)
MMBtu
-
-
gal
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,258
Cost:
$1,500
$1,258 22,872 - - - - - - - - $1,258
22,872
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,173
Cost:
$4,000
$2,568 24,000 $1,315 144 $(-710) (-109) - - - - $2,568
24,000
kWh
$1,315
144
kW-months/year
$(-710)
(-109)
MMBtu
-
-
gal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,402
Cost:
$90
$1,130 10,557 $272 30 - - - - - - $1,130
10,557
kWh
$272
30
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,644
Cost:
$9,576
$4,208 39,330 $1,436 157 - - - - - - $4,208
39,330
kWh
$1,436
157
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,239
Cost:
$4,250
$2,149 20,080 $1,090 119 - - - - - - $2,149
20,080
kWh
$1,090
119
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$4,278
Cost:
-
- - - - - - $4,278 1,060 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,278
1,060
gal
-
-
$
08: 4.446 AUTOMATE FINISHING PROCESS Savings:
$52,000
Cost:
$60,000
- - - - - - - - $52,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$52,000
-
$
09: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$9,500
Cost:
$7,000
- - - - - - - - $9,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$9,500
-
$
TOTAL RECOMMENDED Savings:
$88,870
Cost:
$106,416
$14,871 150,089 $7,948 870 $273 (-260) $4,278 1,060 $61,500 - $14,871
150,089
kWh
$7,948
870
kW-months/year
$273
(-260)
MMBtu
$4,278
1,060
gal
$61,500
-
$
TOTAL IMPLEMENTED Savings:
$25,255
Cost:
$22,166
$9,164 96,759 $3,023 331 $(-710) (-109) $4,278 1,060 $9,500 - $9,164
96,759
kWh
$3,023
331
kW-months/year
$(-710)
(-109)
MMBtu
$4,278
1,060
gal
$9,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes