IAC Assessment: SD0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product Aluminum extrusion
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 46,736
Annual Production 24,000,000 Pounds
Production Hrs. Annual 7,344
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,141 2,860,364 kWh $0.07
Electricity Demand $57,363 7,594 kW-months/year $7.55
Electricity Fees $4,121 - $ -
Natural Gas $121,977 20,183 MMBtu $6.04
TOTAL ENERGY COSTS $398,102
RECOMMENDED SAVINGS* $234,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,062
Cost:
$1,000
$1,771 24,000 $1,291 171 - - - - - - - - - - $1,771
24,000
kWh
$1,291
171
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$469
Cost:
$100
$469 6,355 - - - - - - - - - - - - $469
6,355
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,529
Cost:
$320
$7,213 97,730 $1,316 174 - - - - - - - - - - $7,213
97,730
kWh
$1,316
174
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$419
Cost:
$250
- - - - $419 70 - - - - - - - - -
-
kWh
-
-
kW-months/year
$419
70
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,279
Cost:
$10,000
- - - - $8,279 1,373 - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,279
1,373
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$92,084
Cost:
$30,000
- - - - - - $92,084 480,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$92,084
480,000
lb
-
-
$
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,791
Cost:
$7,900
- - - - - - - - - - $(-100) - $7,891 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$(-100)
-
$
$7,891
-
$
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$69,200
Cost:
$50,000
- - - - - - - - $76,200 - $(-7,000) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$76,200
-
$
$(-7,000)
-
$
-
-
$
09: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$43,085
Cost:
$55,000
- - - - - - - - $50,085 - $(-7,000) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$50,085
-
$
$(-7,000)
-
$
-
-
$
10: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,680
Cost:
$200
- - - - - - - - $1,680 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,680
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$234,598
Cost:
$154,770
$9,453 128,085 $2,607 345 $8,698 1,443 $92,084 480,000 $127,965 - $(-14,100) - $7,891 - $9,453
128,085
kWh
$2,607
345
kW-months/year
$8,698
1,443
MMBtu
$92,084
480,000
lb
$127,965
-
$
$(-14,100)
-
$
$7,891
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost