IAC logo
IAC Assessment: SD0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product Brass mill rod and shape products
NAICS n/a
SIC 3351 - Copper Rolling And Drawing
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 320,000
Annual Production 40,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $720,008 15,981,904 kWh $0.05
Electricity Demand $31,122 41,786 kW-months/year $0.74
Electricity Fees $28,175 - $ -
Natural Gas $169,721 33,995 MMBtu $4.99
TOTAL ENERGY COSTS $949,026
RECOMMENDED SAVINGS* $591,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,478
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$34,478
Cost:
$1,400
$33,380 741,762 $1,098 1,484 - - - - - - - - - - $33,380
741,762
kWh
$1,098
1,484
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$32,897
Cost:
$60,000
$32,002 709,578 $895 1,209 - - - - - - - - - - $32,002
709,578
kWh
$895
1,209
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$17,602
Cost:
$37,000
$15,560 345,000 $2,042 2,760 - - - - - - - - - - $15,560
345,000
kWh
$2,042
2,760
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,025
Cost:
$2,250
$972 21,560 $53 72 - - - - - - - - - - $972
21,560
kWh
$53
72
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$21,557
Cost:
$45,000
$32,472 720,000 $1,776 2,400 $(-12,691) (-2,649) - - - - - - - - $32,472
720,000
kWh
$1,776
2,400
kW-months/year
$(-12,691)
(-2,649)
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$465,613
Cost:
$1,000,000
$39,293 871,250 $1,820 2,460 - - $48,000 50,000 - - $376,500 - - - $39,293
871,250
kWh
$1,820
2,460
kW-months/year
-
-
MMBtu
$48,000
50,000
gal
-
-
lb
$376,500
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,190
Cost:
$15,000
- - - - - - - - - - - - $4,190 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$4,190
-
$
08: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$14,000
Cost:
$5,800
- - - - - - - - $14,000 39,100 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$14,000
39,100
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$591,362
Cost:
$1,166,450
$153,679 3,409,150 $7,684 10,385 $(-12,691) (-2,649) $48,000 50,000 $14,000 39,100 $376,500 - $4,190 - $153,679
3,409,150
kWh
$7,684
10,385
kW-months/year
$(-12,691)
(-2,649)
MMBtu
$48,000
50,000
gal
$14,000
39,100
lb
$376,500
-
$
$4,190
-
$
TOTAL IMPLEMENTED Savings:
$34,478
Cost:
$1,400
$33,380 741,762 $1,098 1,484 - - - - - - - - - - $33,380
741,762
kWh
$1,098
1,484
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes One-time Revenue or Avoided Cost