IAC logo
IAC Assessment: SD0283
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0283
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product Alumimum forging
NAICS n/a
SIC 3463 - Nonferrous Forgings
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 500,000
Annual Production 4,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $249,884 3,728,386 kWh $0.07
Electricity Demand $139,020 11,038 kW-months/year $12.59
Electricity Fees $26,402 - $ -
Natural Gas $1,184,526 122,653 MMBtu $9.66
TOTAL ENERGY COSTS $1,602,020
RECOMMENDED SAVINGS* $3,687,394 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,429
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,925
Cost:
$144,000
$28,576 426,507 $3,349 266 - - - - $28,576
426,507
kWh
$3,349
266
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,393
Cost:
$480
$9,237 137,861 $3,156 251 - - - - $9,237
137,861
kWh
$3,156
251
kW-months/year
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,243
Cost:
$6,000
$2,770 41,350 $473 38 - - - - $2,770
41,350
kWh
$473
38
kW-months/year
-
-
$
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,566
Cost:
$5,950
$5,868 87,581 $2,698 214 - - - - $5,868
87,581
kWh
$2,698
214
kW-months/year
-
-
$
-
-
$
05: 2.7145 INSTALL SKYLIGHTS Savings:
$9,916
Cost:
$28,500
$4,188 62,512 $5,728 455 - - - - $4,188
62,512
kWh
$5,728
455
kW-months/year
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$17,992
Cost:
$2,300
$13,409 200,130 $4,583 364 - - - - $13,409
200,130
kWh
$4,583
364
kW-months/year
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$9,044
Cost:
$18,000
- - - - - - $9,044 - -
-
kWh
-
-
kW-months/year
-
-
$
$9,044
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$476,943
Cost:
$325,000
- - - - - - $476,943 - -
-
kWh
-
-
kW-months/year
-
-
$
$476,943
-
$
09: 4.124 INSTALL CONTINUOUS LUBRICATION EQUIPMENT Savings:
$385,010
Cost:
$152,000
- - - - $385,010 - - - -
-
kWh
-
-
kW-months/year
$385,010
-
$
-
-
$
10: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$2,622,000
Cost:
$180,000
- - - - $2,622,000 - - - -
-
kWh
-
-
kW-months/year
$2,622,000
-
$
-
-
$
11: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$110,362
Cost:
$400,000
- - - - - - $110,362 - -
-
kWh
-
-
kW-months/year
-
-
$
$110,362
-
$
TOTAL RECOMMENDED Savings:
$3,687,394
Cost:
$1,262,230
$64,048 955,941 $19,987 1,588 $3,007,010 - $596,349 - $64,048
955,941
kWh
$19,987
1,588
kW-months/year
$3,007,010
-
$
$596,349
-
$
TOTAL IMPLEMENTED Savings:
$39,429
Cost:
$20,780
$22,646 337,991 $7,739 615 - - $9,044 - $22,646
337,991
kWh
$7,739
615
kW-months/year
-
-
$
$9,044
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost