Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2002
Principal Product sand
NAICS n/a
SIC 1446 - Industrial Sand
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 52,272,000
Annual Production 500,000 Tons
Production Hrs. Annual 8,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $964,439 11,919,186 kWh $0.08
Electricity Demand $271,415 23,892 kW-months/year $11.36
Electricity Fees $2,705 - $ -
Natural Gas $1,362,409 134,098 MMBtu $10.16
TOTAL ENERGY COSTS $2,607,958
RECOMMENDED SAVINGS* $64,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,172
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)
$ kWh $ kW-months/year $ gal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,696
Cost:
$30,000
$29,732 367,519 $5,964 525 - - $29,732
367,519
kWh
$5,964
525
kW-months/year
-
-
gal
02: 2.7145 INSTALL SKYLIGHTS Savings:
$3,317
Cost:
$5,500
$1,715 21,204 $1,602 141 - - $1,715
21,204
kWh
$1,602
141
kW-months/year
-
-
gal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,172
Cost:
$30,000
$18,469 228,291 $3,703 326 - - $18,469
228,291
kWh
$3,703
326
kW-months/year
-
-
gal
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$3,495
Cost:
-
- - - - $3,495 - -
-
kWh
-
-
kW-months/year
$3,495
-
gal
TOTAL RECOMMENDED Savings:
$64,680
Cost:
$65,500
$49,916 617,014 $11,269 992 $3,495 - $49,916
617,014
kWh
$11,269
992
kW-months/year
$3,495
-
gal
TOTAL IMPLEMENTED Savings:
$22,172
Cost:
$30,000
$18,469 228,291 $3,703 326 - - $18,469
228,291
kWh
$3,703
326
kW-months/year
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)