Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2002 |
Principal Product | plastic pipe fittings |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 470,000 |
Annual Production | 11,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $574,619 | 6,069,601 | kWh | $0.09 |
Electricity Demand | $154,638 | 11,997 | kW-months/year | $12.89 |
Electricity Fees | $4,308 | - | $ | - |
Natural Gas | $2,447 | 246 | MMBtu | $9.95 |
TOTAL ENERGY COSTS | $741,048 | |||
RECOMMENDED SAVINGS* | $235,337 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $79,953 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,119 Cost: $92,500 |
$8,457 | 89,301 | $1,662 | 129 | - | - | - | - |
$8,457 89,301 kWh |
$1,662 129 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $5,051 Cost: - |
- | - | $5,051 | - | - | - | - | - |
- - kWh |
$5,051 - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $13,010 Cost: $3,550 |
$13,010 | 137,390 | - | - | - | - | - | - |
$13,010 137,390 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,675 Cost: - |
$1,303 | 17,712 | $372 | 45 | - | - | - | - |
$1,303 17,712 kWh |
$372 45 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $7,194 Cost: - |
- | - | $7,194 | - | - | - | - | - |
- - kWh |
$7,194 - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $4,596 Cost: $650 |
$2,585 | 27,300 | $2,011 | 156 | - | - | - | - |
$2,585 27,300 kWh |
$2,011 156 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $10,780 Cost: $5,000 |
- | - | - | - | $10,780 | - | - | - |
- - kWh |
- - kW-months/year |
$10,780 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $58,512 Cost: $41,000 |
- | - | - | - | - | - | $58,512 | - |
- - kWh |
- - kW-months/year |
- - lb |
$58,512 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $124,400 Cost: $180,000 |
- | - | - | - | - | - | $124,400 | - |
- - kWh |
- - kW-months/year |
- - lb |
$124,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $235,337 Cost: $322,700 |
$25,355 | 271,703 | $16,290 | 330 | $10,780 | - | $182,912 | - | $25,355 271,703 kWh |
$16,290 330 kW-months/year |
$10,780 - lb |
$182,912 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $79,953 Cost: $134,150 |
$12,345 | 134,313 | $9,096 | 330 | - | - | $58,512 | - | $12,345 134,313 kWh |
$9,096 330 kW-months/year |
- - lb |
$58,512 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |