Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2002 |
Principal Product | Injection molding |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 28,000 |
Annual Production | 3,360,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $190,162 | 1,760,840 | kWh | $0.11 |
Electricity Demand | $36,663 | 4,376 | kW-months/year | $8.38 |
Electricity Fees | $720 | - | $ | - |
Natural Gas | $653 | 62 | MMBtu | $10.53 |
TOTAL ENERGY COSTS | $231,727 | |||
RECOMMENDED SAVINGS* | $72,063 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,897 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $36,601 Cost: $40,000 |
$33,014 | 305,691 | $3,587 | 428 | - | - | - | - | - | - |
$33,014 305,691 kWh |
$3,587 428 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $10,981 Cost: $1,000 |
$9,909 | 91,753 | $1,072 | 128 | - | - | - | - | - | - |
$9,909 91,753 kWh |
$1,072 128 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,955 Cost: $4,712 |
$5,109 | 47,308 | $846 | 101 | - | - | - | - | - | - |
$5,109 47,308 kWh |
$846 101 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,379 Cost: $500 |
$851 | 7,875 | $528 | 63 | - | - | - | - | - | - |
$851 7,875 kWh |
$528 63 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $878 Cost: - |
$792 | 7,335 | $86 | 10 | - | - | - | - | - | - |
$792 7,335 kWh |
$86 10 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,766 Cost: $616 |
$3,766 | 34,875 | - | - | - | - | - | - | - | - |
$3,766 34,875 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,500 Cost: $5,000 |
- | - | - | - | $2,500 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,500 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $5,965 Cost: $3,500 |
- | - | - | - | - | - | $5,965 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$5,965 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $2,019 Cost: $5,500 |
- | - | - | - | - | - | - | - | $2,019 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$2,019 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.2111 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE |
Savings: $2,019 Cost: $5,800 |
- | - | - | - | - | - | - | - | $2,019 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$2,019 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,063 Cost: $66,628 |
$53,441 | 494,837 | $6,119 | 730 | $2,500 | - | $5,965 | - | $4,038 | - | $53,441 494,837 kWh |
$6,119 730 kW-months/year |
$2,500 - lb |
$5,965 - $ |
$4,038 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,897 Cost: $12,300 |
$10,701 | 99,088 | $1,158 | 138 | - | - | - | - | $4,038 | - | $10,701 99,088 kWh |
$1,158 138 kW-months/year |
- - lb |
- - $ |
$4,038 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | One-time Revenue or Avoided Cost |