IAC Assessment: SD0296
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0296
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2002
Principal Product Injection molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 28,000
Annual Production 3,360,000 Pounds
Production Hrs. Annual 8,568
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $190,162 1,760,840 kWh $0.11
Electricity Demand $36,663 4,376 kW-months/year $8.38
Electricity Fees $720 - $ -
Natural Gas $653 62 MMBtu $10.53
TOTAL ENERGY COSTS $231,727
RECOMMENDED SAVINGS* $72,063 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,897
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$36,601
Cost:
$40,000
$33,014 305,691 $3,587 428 - - - - - - $33,014
305,691
kWh
$3,587
428
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$10,981
Cost:
$1,000
$9,909 91,753 $1,072 128 - - - - - - $9,909
91,753
kWh
$1,072
128
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,955
Cost:
$4,712
$5,109 47,308 $846 101 - - - - - - $5,109
47,308
kWh
$846
101
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,379
Cost:
$500
$851 7,875 $528 63 - - - - - - $851
7,875
kWh
$528
63
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$878
Cost:
-
$792 7,335 $86 10 - - - - - - $792
7,335
kWh
$86
10
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,766
Cost:
$616
$3,766 34,875 - - - - - - - - $3,766
34,875
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,500
Cost:
$5,000
- - - - $2,500 - - - - - -
-
kWh
-
-
kW-months/year
$2,500
-
lb
-
-
$
-
-
$
08: 3.2176 INCREASE USE OF AUTOMATION Savings:
$5,965
Cost:
$3,500
- - - - - - $5,965 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,965
-
$
-
-
$
09: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,019
Cost:
$5,500
- - - - - - - - $2,019 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$2,019
-
$
10: 3.2111 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE Savings:
$2,019
Cost:
$5,800
- - - - - - - - $2,019 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$2,019
-
$
TOTAL RECOMMENDED Savings:
$72,063
Cost:
$66,628
$53,441 494,837 $6,119 730 $2,500 - $5,965 - $4,038 - $53,441
494,837
kWh
$6,119
730
kW-months/year
$2,500
-
lb
$5,965
-
$
$4,038
-
$
TOTAL IMPLEMENTED Savings:
$15,897
Cost:
$12,300
$10,701 99,088 $1,158 138 - - - - $4,038 - $10,701
99,088
kWh
$1,158
138
kW-months/year
-
-
lb
-
-
$
$4,038
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost One-time Revenue or Avoided Cost