IAC Assessment: SD0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2002
Principal Product Aerospace teflon parts
NAICS n/a
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 32,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,221 1,839,865 kWh $0.12
Electricity Demand $37,882 4,518 kW-months/year $8.38
Electricity Fees $1,811 - $ -
Natural Gas $7,096 1,364 MMBtu $5.20
TOTAL ENERGY COSTS $273,532
RECOMMENDED SAVINGS* $100,471 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$30,135
Cost:
$58,000
$22,785 186,150 $7,350 876 - - - - $22,785
186,150
kWh
$7,350
876
kW-months/year
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,968
Cost:
$320
$5,836 47,683 $1,132 135 - - - - $5,836
47,683
kWh
$1,132
135
kW-months/year
-
-
lb
-
-
$
03: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$3,733
Cost:
$1,000
$3,733 30,496 - - - - - - $3,733
30,496
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,775
Cost:
$6,000
$1,792 14,640 $983 117 - - - - $1,792
14,640
kWh
$983
117
kW-months/year
-
-
lb
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,690
Cost:
$1,200
$2,690 21,980 - - - - - - $2,690
21,980
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,586
Cost:
$1,000
$1,326 10,841 $260 31 - - - - $1,326
10,841
kWh
$260
31
kW-months/year
-
-
lb
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,584
Cost:
$2,000
- - - - $1,584 - - - -
-
kWh
-
-
kW-months/year
$1,584
-
lb
-
-
$
08: 3.2176 INCREASE USE OF AUTOMATION Savings:
$51,000
Cost:
$50,000
- - - - - - $51,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$51,000
-
$
TOTAL RECOMMENDED Savings:
$100,471
Cost:
$119,520
$38,162 311,790 $9,725 1,159 $1,584 - $51,000 - $38,162
311,790
kWh
$9,725
1,159
kW-months/year
$1,584
-
lb
$51,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes