IAC Assessment: SD0302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2002
Principal Product Valves
NAICS n/a
SIC 3494 - Valves And Pipe Fittings, Nec
Sales n/a
# of Employees 250
Plant Area (Sq.Ft.) 95,028
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $248,057 2,264,529 kWh $0.11
Electricity Demand $98,250 7,761 kW-months/year $12.66
Electricity Fees $3,478 - $ -
Natural Gas $15,704 2,204 MMBtu $7.13
TOTAL ENERGY COSTS $372,230
RECOMMENDED SAVINGS* $42,382 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $427
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ lb $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,323
Cost:
$34,000
$11,633 106,224 $2,690 212 - - - - - - $11,633
106,224
kWh
$2,690
212
kW-months/year
-
-
lb
-
-
lb
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$6,262
Cost:
$2,000
$3,253 29,709 $3,009 238 - - - - - - $3,253
29,709
kWh
$3,009
238
kW-months/year
-
-
lb
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,968
Cost:
$12,000
$3,231 29,520 $3,737 295 - - - - - - $3,231
29,520
kWh
$3,737
295
kW-months/year
-
-
lb
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,228
Cost:
-
$1,681 15,353 $1,547 122 - - - - - - $1,681
15,353
kWh
$1,547
122
kW-months/year
-
-
lb
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$964
Cost:
$800
$964 8,800 - - - - - - - - $964
8,800
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,000
Cost:
$10,000
- - - - $5,000 - - - - - -
-
kWh
-
-
kW-months/year
$5,000
-
lb
-
-
lb
-
-
$
07: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$5,210
Cost:
$6,000
- - - - - - $5,210 1,300 - - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,210
1,300
lb
-
-
$
08: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$427
Cost:
-
- - - - - - - - $427 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$427
-
$
TOTAL RECOMMENDED Savings:
$42,382
Cost:
$64,800
$20,762 189,606 $10,983 867 $5,000 - $5,210 1,300 $427 - $20,762
189,606
kWh
$10,983
867
kW-months/year
$5,000
-
lb
$5,210
1,300
lb
$427
-
$
TOTAL IMPLEMENTED Savings:
$427
Cost:
-
- - - - - - - - $427 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$427
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes