Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2002 |
Principal Product | Valves |
NAICS | n/a |
SIC | 3494 - Valves And Pipe Fittings, Nec |
Sales | n/a |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 95,028 |
Annual Production | 0 Units |
Production Hrs. Annual | 6,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $248,057 | 2,264,529 | kWh | $0.11 |
Electricity Demand | $98,250 | 7,761 | kW-months/year | $12.66 |
Electricity Fees | $3,478 | - | $ | - |
Natural Gas | $15,704 | 2,204 | MMBtu | $7.13 |
TOTAL ENERGY COSTS | $372,230 | |||
RECOMMENDED SAVINGS* | $42,382 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $427 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,323 Cost: $34,000 |
$11,633 | 106,224 | $2,690 | 212 | - | - | - | - | - | - |
$11,633 106,224 kWh |
$2,690 212 kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7145 INSTALL SKYLIGHTS |
Savings: $6,262 Cost: $2,000 |
$3,253 | 29,709 | $3,009 | 238 | - | - | - | - | - | - |
$3,253 29,709 kWh |
$3,009 238 kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,968 Cost: $12,000 |
$3,231 | 29,520 | $3,737 | 295 | - | - | - | - | - | - |
$3,231 29,520 kWh |
$3,737 295 kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,228 Cost: - |
$1,681 | 15,353 | $1,547 | 122 | - | - | - | - | - | - |
$1,681 15,353 kWh |
$1,547 122 kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $964 Cost: $800 |
$964 | 8,800 | - | - | - | - | - | - | - | - |
$964 8,800 kWh |
- - kW-months/year |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,000 Cost: $10,000 |
- | - | - | - | $5,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,000 - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS |
Savings: $5,210 Cost: $6,000 |
- | - | - | - | - | - | $5,210 | 1,300 | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$5,210 1,300 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $427 Cost: - |
- | - | - | - | - | - | - | - | $427 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - lb |
$427 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,382 Cost: $64,800 |
$20,762 | 189,606 | $10,983 | 867 | $5,000 | - | $5,210 | 1,300 | $427 | - | $20,762 189,606 kWh |
$10,983 867 kW-months/year |
$5,000 - lb |
$5,210 1,300 lb |
$427 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $427 Cost: - |
- | - | - | - | - | - | - | - | $427 | - | - - kWh |
- - kW-months/year |
- - lb |
- - lb |
$427 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes |