IAC logo
IAC Assessment: SD0303
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0303
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2002
Principal Product Manufactured homes
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $50,000,000-$100,000,000
# of Employees 460
Plant Area (Sq.Ft.) 200,000
Annual Production 1,200 Pieces
Production Hrs. Annual 2,125
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,306 1,355,878 kWh $0.12
Electricity Demand $46,532 5,615 kW-months/year $8.29
Electricity Fees $722 - $ -
TOTAL ENERGY COSTS $212,478
RECOMMENDED SAVINGS* $51,990 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,133
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$17,018
Cost:
$30,684
$12,849 110,015 $4,169 503 - - $12,849
110,015
kWh
$4,169
503
kW-months/year
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,991
Cost:
$1,642
$7,849 67,199 $3,142 379 - - $7,849
67,199
kWh
$3,142
379
kW-months/year
-
-
lb
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,435
Cost:
$19,000
$7,451 63,795 $2,984 360 - - $7,451
63,795
kWh
$2,984
360
kW-months/year
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,336
Cost:
$6,324
$4,029 34,499 $1,307 158 - - $4,029
34,499
kWh
$1,307
158
kW-months/year
-
-
lb
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$3,133
Cost:
$500
$2,238 19,162 $895 108 - - $2,238
19,162
kWh
$895
108
kW-months/year
-
-
lb
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,457
Cost:
$1,800
$1,457 12,474 - - - - $1,457
12,474
kWh
-
-
kW-months/year
-
-
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,620
Cost:
$6,000
- - - - $3,620 - -
-
kWh
-
-
kW-months/year
$3,620
-
lb
TOTAL RECOMMENDED Savings:
$51,990
Cost:
$65,950
$35,873 307,144 $12,497 1,508 $3,620 - $35,873
307,144
kWh
$12,497
1,508
kW-months/year
$3,620
-
lb
TOTAL IMPLEMENTED Savings:
$3,133
Cost:
$500
$2,238 19,162 $895 108 - - $2,238
19,162
kWh
$895
108
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)