IAC Assessment: SD0316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2003
Principal Product Frozen Fruits/Vegetables
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 44,500
Annual Production 42,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $291,142 2,535,524 kWh $0.11
Electricity Demand $85,431 7,587 kW-months/year $11.26
TOTAL ENERGY COSTS $404,896
RECOMMENDED SAVINGS* $70,583 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,913
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,055
Cost:
$3,750
$2,780 24,622 $275 25 - - - - - - $2,780
24,622
kWh
$275
25
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,922
Cost:
-
$2,362 20,924 $560 49 - - - - - - $2,362
20,924
kWh
$560
49
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,991
Cost:
$300
$1,656 14,682 $335 29 - - - - - - $1,656
14,682
kWh
$335
29
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$872
Cost:
$1,000
$521 4,612 $351 31 - - - - - - $521
4,612
kWh
$351
31
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$47,600
Cost:
$40,000
- - - - - - - - $47,600 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$47,600
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$11,188
Cost:
$10,000
- - - - - - $11,188 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$11,188
-
lb
-
-
$
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,955
Cost:
$9,800
- - - - $2,955 738,796 - - - - -
-
kWh
-
-
kW-months/year
$2,955
738,796
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$70,583
Cost:
$64,850
$7,319 64,840 $1,521 134 $2,955 738,796 $11,188 - $47,600 - $7,319
64,840
kWh
$1,521
134
kW-months/year
$2,955
738,796
Tgal
$11,188
-
lb
$47,600
-
$
TOTAL IMPLEMENTED Savings:
$4,913
Cost:
$300
$4,018 35,606 $895 78 - - - - - - $4,018
35,606
kWh
$895
78
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes