Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2003 |
Principal Product | Frozen Fruits/Vegetables |
NAICS | 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | $10,000,000-$50,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 44,500 |
Annual Production | 42,500,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $291,142 | 2,535,524 | kWh | $0.11 |
Electricity Demand | $85,431 | 7,587 | kW-months/year | $11.26 |
TOTAL ENERGY COSTS | $404,896 | |||
RECOMMENDED SAVINGS* | $70,583 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,913 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,055 Cost: $3,750 |
$2,780 | 24,622 | $275 | 25 | - | - | - | - | - | - |
$2,780 24,622 kWh |
$275 25 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,922 Cost: - |
$2,362 | 20,924 | $560 | 49 | - | - | - | - | - | - |
$2,362 20,924 kWh |
$560 49 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,991 Cost: $300 |
$1,656 | 14,682 | $335 | 29 | - | - | - | - | - | - |
$1,656 14,682 kWh |
$335 29 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7145 INSTALL SKYLIGHTS |
Savings: $872 Cost: $1,000 |
$521 | 4,612 | $351 | 31 | - | - | - | - | - | - |
$521 4,612 kWh |
$351 31 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $47,600 Cost: $40,000 |
- | - | - | - | - | - | - | - | $47,600 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$47,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $11,188 Cost: $10,000 |
- | - | - | - | - | - | $11,188 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$11,188 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $2,955 Cost: $9,800 |
- | - | - | - | $2,955 | 738,796 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,955 738,796 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,583 Cost: $64,850 |
$7,319 | 64,840 | $1,521 | 134 | $2,955 | 738,796 | $11,188 | - | $47,600 | - | $7,319 64,840 kWh |
$1,521 134 kW-months/year |
$2,955 738,796 Tgal |
$11,188 - lb |
$47,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,913 Cost: $300 |
$4,018 | 35,606 | $895 | 78 | - | - | - | - | - | - | $4,018 35,606 kWh |
$895 78 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes |