IAC Assessment: SD0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2003
Principal Product Clay Roofing Tile
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3259 - Structural Clay Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 80,000
Annual Production 2,500,000 Pieces
Production Hrs. Annual 6,188
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $289,314 2,738,146 kWh $0.11
Electricity Demand $72,882 6,309 kW-months/year $11.55
TOTAL ENERGY COSTS $383,796
RECOMMENDED SAVINGS* $48,808 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$18,680
Cost:
$350
$16,190 152,880 $2,490 210 - - $16,190
152,880
kWh
$2,490
210
kW-months/year
-
-
lb
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,972
Cost:
$15,200
$7,972 75,280 - - - - $7,972
75,280
kWh
-
-
kW-months/year
-
-
lb
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,354
Cost:
$16
$3,761 35,510 $593 50 - - $3,761
35,510
kWh
$593
50
kW-months/year
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,969
Cost:
$200
$2,566 24,224 $403 34 - - $2,566
24,224
kWh
$403
34
kW-months/year
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,481
Cost:
$4,500
$2,481 23,431 - - - - $2,481
23,431
kWh
-
-
kW-months/year
-
-
lb
06: 2.7145 INSTALL SKYLIGHTS Savings:
$1,552
Cost:
$600
$1,552 14,651 - - - - $1,552
14,651
kWh
-
-
kW-months/year
-
-
lb
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,800
Cost:
$10,000
- - - - $10,800 - -
-
kWh
-
-
kW-months/year
$10,800
-
lb
TOTAL RECOMMENDED Savings:
$48,808
Cost:
$30,866
$34,522 325,976 $3,486 294 $10,800 - $34,522
325,976
kWh
$3,486
294
kW-months/year
$10,800
-
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)