IAC Assessment: SD0318
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0318
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2003
Principal Product O-rings
NAICS 339991 - Gasket, Packing, and Sealing Device Manufacturing
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 744
Plant Area (Sq.Ft.) 86,400
Annual Production 3,170,000 Pieces
Production Hrs. Annual 2,125
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,016 2,172,800 kWh $0.11
Electricity Demand $48,638 8,205 kW-months/year $5.93
TOTAL ENERGY COSTS $287,854
RECOMMENDED SAVINGS* $78,582 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,757
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$44,624
Cost:
$76,000
$36,973 342,342 $9,025 1,522 $(-1,374) (-1,374) - - $36,973
342,342
kWh
$9,025
1,522
kW-months/year
$(-1,374)
(-1,374)
MMBtu
-
-
lb
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$12,503
Cost:
$25,000
$9,301 86,118 $3,202 540 - - - - $9,301
86,118
kWh
$3,202
540
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7145 INSTALL SKYLIGHTS Savings:
$12,438
Cost:
$8,500
$8,642 80,025 $3,796 640 - - - - $8,642
80,025
kWh
$3,796
640
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,018
Cost:
$2,500
$365 3,381 $3,653 616 - - - - $365
3,381
kWh
$3,653
616
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,160
Cost:
$1,680
$935 8,653 $225 38 - - - - $935
8,653
kWh
$225
38
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$739
Cost:
$300
$564 5,232 $175 30 - - - - $564
5,232
kWh
$175
30
kW-months/year
-
-
MMBtu
-
-
lb
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,100
Cost:
$10,000
- - - - - - $3,100 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,100
-
lb
TOTAL RECOMMENDED Savings:
$78,582
Cost:
$123,980
$56,780 525,751 $20,076 3,386 $(-1,374) (-1,374) $3,100 - $56,780
525,751
kWh
$20,076
3,386
kW-months/year
$(-1,374)
(-1,374)
MMBtu
$3,100
-
lb
TOTAL IMPLEMENTED Savings:
$4,757
Cost:
$2,800
$929 8,613 $3,828 646 - - - - $929
8,613
kWh
$3,828
646
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)