Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2003 |
Principal Product | O-rings |
NAICS | 339991 - Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053 - Gaskets, Packing And Sealing Devices |
Sales | $10,000,000-$50,000,000 |
# of Employees | 744 |
Plant Area (Sq.Ft.) | 86,400 |
Annual Production | 3,170,000 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $233,016 | 2,172,800 | kWh | $0.11 |
Electricity Demand | $48,638 | 8,205 | kW-months/year | $5.93 |
TOTAL ENERGY COSTS | $287,854 | |||
RECOMMENDED SAVINGS* | $78,582 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,757 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $44,624 Cost: $76,000 |
$36,973 | 342,342 | $9,025 | 1,522 | $(-1,374) | (-1,374) | - | - |
$36,973 342,342 kWh |
$9,025 1,522 kW-months/year |
$(-1,374) (-1,374) MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $12,503 Cost: $25,000 |
$9,301 | 86,118 | $3,202 | 540 | - | - | - | - |
$9,301 86,118 kWh |
$3,202 540 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7145 INSTALL SKYLIGHTS |
Savings: $12,438 Cost: $8,500 |
$8,642 | 80,025 | $3,796 | 640 | - | - | - | - |
$8,642 80,025 kWh |
$3,796 640 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,018 Cost: $2,500 |
$365 | 3,381 | $3,653 | 616 | - | - | - | - |
$365 3,381 kWh |
$3,653 616 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,160 Cost: $1,680 |
$935 | 8,653 | $225 | 38 | - | - | - | - |
$935 8,653 kWh |
$225 38 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $739 Cost: $300 |
$564 | 5,232 | $175 | 30 | - | - | - | - |
$564 5,232 kWh |
$175 30 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $3,100 Cost: $10,000 |
- | - | - | - | - | - | $3,100 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,100 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,582 Cost: $123,980 |
$56,780 | 525,751 | $20,076 | 3,386 | $(-1,374) | (-1,374) | $3,100 | - | $56,780 525,751 kWh |
$20,076 3,386 kW-months/year |
$(-1,374) (-1,374) MMBtu |
$3,100 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,757 Cost: $2,800 |
$929 | 8,613 | $3,828 | 646 | - | - | - | - | $929 8,613 kWh |
$3,828 646 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |