IAC Assessment: SD0332
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0332
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2004
Principal Product Cardboard Boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 480,000
Annual Production 46,000 Tons
Production Hrs. Annual 4,675
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,775 3,294,420 kWh $0.07
Electricity Demand $20,123 7,297 kW-months/year $2.76
Natural Gas $52,858 63,089 MMBtu $0.84
TOTAL ENERGY COSTS $295,756
RECOMMENDED SAVINGS* $173,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,444
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$164,104
Cost:
$609,600
$215,317 3,185,160 $16,825 6,096 $(-24,170) (-28,842) $(-43,868) - $215,317
3,185,160
kWh
$16,825
6,096
kW-months/year
$(-24,170)
(-28,842)
MMBtu
$(-43,868)
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,679
Cost:
$475
$1,679 24,832 - - - - - - $1,679
24,832
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,765
Cost:
$900
- - - - $2,765 3,299 - - -
-
kWh
-
-
kW-months/year
$2,765
3,299
MMBtu
-
-
$
04: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$1,750
Cost:
$6,000
- - - - $1,750 2,087 - - -
-
kWh
-
-
kW-months/year
$1,750
2,087
MMBtu
-
-
$
05: 2.7145 INSTALL SKYLIGHTS Savings:
$3,460
Cost:
$7,015
$3,460 51,182 - - - - - - $3,460
51,182
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$173,758
Cost:
$623,990
$220,456 3,261,174 $16,825 6,096 $(-19,655) (-23,456) $(-43,868) - $220,456
3,261,174
kWh
$16,825
6,096
kW-months/year
$(-19,655)
(-23,456)
MMBtu
$(-43,868)
-
$
TOTAL IMPLEMENTED Savings:
$4,444
Cost:
$1,375
$1,679 24,832 - - $2,765 3,299 - - $1,679
24,832
kWh
-
-
kW-months/year
$2,765
3,299
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes