Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2004 |
Principal Product | Metal Stampings |
NAICS | 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 2469 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 3,600,000 Pounds |
Production Hrs. Annual | 3,600 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $128,577 | 1,057,780 | kWh | $0.12 |
Electricity Demand | $32,381 | 3,826 | kW-months/year | $8.46 |
Natural Gas | $1,432 | 171 | MMBtu | $8.37 |
TOTAL ENERGY COSTS | $170,790 | |||
RECOMMENDED SAVINGS* | $75,769 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,372 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $19,914 Cost: $22,746 |
$16,124 | 132,602 | $3,790 | 448 | - | - | - | - |
$16,124 132,602 kWh |
$3,790 448 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,538 Cost: $31,523 |
$10,178 | 83,700 | $2,360 | 279 | - | - | - | - |
$10,178 83,700 kWh |
$2,360 279 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $12,279 Cost: $390 |
$8,805 | 81,823 | $3,474 | 273 | - | - | - | - |
$8,805 81,823 kWh |
$3,474 273 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $9,714 Cost: $2,420 |
$7,887 | 64,857 | $1,827 | 216 | - | - | - | - |
$7,887 64,857 kWh |
$1,827 216 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,008 Cost: $10,250 |
$3,648 | 30,000 | $1,218 | 144 | $1,142 | (-137) | - | - |
$3,648 30,000 kWh |
$1,218 144 kW-months/year |
$1,142 (-137) MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,155 Cost: - |
$3,155 | 25,943 | - | - | - | - | - | - |
$3,155 25,943 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $641 Cost: $380 |
$641 | 5,273 | - | - | - | - | - | - |
$641 5,273 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $7,320 Cost: $6,000 |
- | - | - | - | - | - | $7,320 | 96,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,320 96,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $4,200 Cost: $10,000 |
- | - | - | - | - | - | $4,200 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,200 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,769 Cost: $83,709 |
$50,438 | 424,198 | $12,669 | 1,360 | $1,142 | (-137) | $11,520 | 96,000 | $50,438 424,198 kWh |
$12,669 1,360 kW-months/year |
$1,142 (-137) MMBtu |
$11,520 96,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,372 Cost: $55,039 |
$35,748 | 303,398 | $9,624 | 1,000 | - | - | - | - | $35,748 303,398 kWh |
$9,624 1,000 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |