IAC logo
IAC Assessment: SD0335
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2004
Principal Product metal hoses, tubes
NAICS 335210 - Small Electrical Appliance Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 29,000
Annual Production 200,000 Thousand Feet
Production Hrs. Annual 2,625
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,953 1,153,610 kWh $0.12
Electricity Demand $24,253 4,690 kW-months/year $5.17
TOTAL ENERGY COSTS $161,694
RECOMMENDED SAVINGS* $27,645 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,982
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,899
Cost:
$8,001
$2,377 21,000 $522 101 - - - - $2,377
21,000
kWh
$522
101
kW-months/year
-
-
Tgal
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,194
Cost:
$80
$1,039 7,500 $155 30 - - - - $1,039
7,500
kWh
$155
30
kW-months/year
-
-
Tgal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$857
Cost:
-
$736 5,207 $121 23 - - - - $736
5,207
kWh
$121
23
kW-months/year
-
-
Tgal
-
-
$
04: 3.5132 REUSE RICH WHITE WATER IN OTHER APPLICATIONS Savings:
$10,570
Cost:
$14,000
$10,430 88,471 - - $140 210 - - $10,430
88,471
kWh
-
-
kW-months/year
$140
210
Tgal
-
-
$
05: 2.5194 REDESIGN PROCESS Savings:
$12,125
Cost:
$8,000
- - - - - - $12,125 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$12,125
-
$
TOTAL RECOMMENDED Savings:
$27,645
Cost:
$30,081
$14,582 122,178 $798 154 $140 210 $12,125 - $14,582
122,178
kWh
$798
154
kW-months/year
$140
210
Tgal
$12,125
-
$
TOTAL IMPLEMENTED Savings:
$12,982
Cost:
$8,000
$736 5,207 $121 23 - - $12,125 - $736
5,207
kWh
$121
23
kW-months/year
-
-
Tgal
$12,125
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes