Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2004 |
Principal Product | metal hoses, tubes |
NAICS | 335210 - Small Electrical Appliance Manufacturing |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 29,000 |
Annual Production | 200,000 Thousand Feet |
Production Hrs. Annual | 2,625 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $135,953 | 1,153,610 | kWh | $0.12 |
Electricity Demand | $24,253 | 4,690 | kW-months/year | $5.17 |
TOTAL ENERGY COSTS | $161,694 | |||
RECOMMENDED SAVINGS* | $27,645 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,982 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,899 Cost: $8,001 |
$2,377 | 21,000 | $522 | 101 | - | - | - | - |
$2,377 21,000 kWh |
$522 101 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,194 Cost: $80 |
$1,039 | 7,500 | $155 | 30 | - | - | - | - |
$1,039 7,500 kWh |
$155 30 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $857 Cost: - |
$736 | 5,207 | $121 | 23 | - | - | - | - |
$736 5,207 kWh |
$121 23 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5132 REUSE RICH WHITE WATER IN OTHER APPLICATIONS |
Savings: $10,570 Cost: $14,000 |
$10,430 | 88,471 | - | - | $140 | 210 | - | - |
$10,430 88,471 kWh |
- - kW-months/year |
$140 210 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.5194 REDESIGN PROCESS |
Savings: $12,125 Cost: $8,000 |
- | - | - | - | - | - | $12,125 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$12,125 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,645 Cost: $30,081 |
$14,582 | 122,178 | $798 | 154 | $140 | 210 | $12,125 | - | $14,582 122,178 kWh |
$798 154 kW-months/year |
$140 210 Tgal |
$12,125 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,982 Cost: $8,000 |
$736 | 5,207 | $121 | 23 | - | - | $12,125 | - | $736 5,207 kWh |
$121 23 kW-months/year |
- - Tgal |
$12,125 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes |