Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2004 |
Principal Product | fasteners |
NAICS | 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452 - Bolts, Nuts, Rivets, And Washers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 5,250 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $412,395 | 5,476,152 | kWh | $0.08 |
Electricity Demand | $175,259 | 18,439 | kW-months/year | $9.50 |
Natural Gas | $58,405 | 9,088 | MMBtu | $6.43 |
TOTAL ENERGY COSTS | $646,059 | |||
RECOMMENDED SAVINGS* | $320,126 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $132,869 Cost: $208,000 |
$152,600 | 2,521,800 | $17,100 | 3,834 | $(-36,831) | 11,470 | - | - | - | - | - | - |
$152,600 2,521,800 kWh |
$17,100 3,834 kW-months/year |
$(-36,831) 11,470 MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $30,060 Cost: $22,746 |
$25,804 | 342,675 | $4,256 | 448 | - | - | - | - | - | - | - | - |
$25,804 342,675 kWh |
$4,256 448 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $26,802 Cost: $24,875 |
$29,277 | 388,800 | $18,430 | 1,940 | $(-20,905) | 3,253 | - | - | - | - | - | - |
$29,277 388,800 kWh |
$18,430 1,940 kW-months/year |
$(-20,905) 3,253 MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $8,450 Cost: $18,000 |
- | - | - | - | $8,450 | 1,315 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,450 1,315 MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,120 Cost: $470 |
$7,120 | 94,560 | - | - | - | - | - | - | - | - | - | - |
$7,120 94,560 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $6,459 Cost: $7,965 |
$4,749 | 63,073 | $1,710 | 180 | - | - | - | - | - | - | - | - |
$4,749 63,073 kWh |
$1,710 180 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,900 Cost: $680 |
$4,579 | 60,783 | $1,321 | 139 | - | - | - | - | - | - | - | - |
$4,579 60,783 kWh |
$1,321 139 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,277 Cost: $6,920 |
$2,277 | 30,242 | - | - | - | - | - | - | - | - | - | - |
$2,277 30,242 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $870 Cost: $1,795 |
$870 | 11,548 | - | - | - | - | - | - | - | - | - | - |
$870 11,548 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,752 Cost: $45,723 |
$11,341 | 150,615 | $3,411 | 359 | - | - | - | - | - | - | - | - |
$11,341 150,615 kWh |
$3,411 359 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $6,792 Cost: $10,000 |
- | - | - | - | - | - | $6,792 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,792 - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $4,375 Cost: $450 |
- | - | - | - | - | - | - | - | $4,375 | 35,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$4,375 35,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $73,400 Cost: $70,000 |
- | - | - | - | - | - | - | - | - | - | $73,400 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
$73,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $320,126 Cost: $417,624 |
$238,617 | 3,664,096 | $46,228 | 6,900 | $(-49,286) | 16,038 | $6,792 | - | $4,375 | 35,000 | $73,400 | - | $238,617 3,664,096 kWh |
$46,228 6,900 kW-months/year |
$(-49,286) 16,038 MMBtu |
$6,792 - lb |
$4,375 35,000 lb |
$73,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes |