Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2004 |
Principal Product | Perfumes and cosmetics |
NAICS | 325620 - Toilet Preparation Manufacturing |
SIC | 2844 - Toilet Preparations |
Sales | $100,000,000-$500,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 10,200,000 Pieces |
Production Hrs. Annual | 5,250 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $129,673 | 1,570,661 | kWh | $0.08 |
Electricity Demand | $40,840 | 7,026 | kW-months/year | $5.81 |
Natural Gas | $35,169 | 4,865 | MMBtu | $7.23 |
TOTAL ENERGY COSTS | $205,682 | |||
RECOMMENDED SAVINGS* | $196,683 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,576 Cost: $440 |
$4,443 | 53,791 | $1,133 | 195 | - | - | - | - | - | - | - | - |
$4,443 53,791 kWh |
$1,133 195 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $15,314 Cost: $46,898 |
$12,979 | 157,126 | $2,335 | 402 | - | - | - | - | - | - | - | - |
$12,979 157,126 kWh |
$2,335 402 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,381 Cost: $2,113 |
- | - | - | - | $2,381 | 329 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,381 329 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $11,520 Cost: $12,000 |
- | - | - | - | - | - | $11,520 | 48,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$11,520 48,000 gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $10,692 Cost: $18,500 |
- | - | - | - | - | - | - | - | $10,692 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$10,692 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $75,100 Cost: $65,000 |
- | - | - | - | - | - | - | - | - | - | $75,100 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$75,100 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $38,050 Cost: $25,000 |
- | - | - | - | - | - | - | - | - | - | $38,050 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$38,050 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $38,050 Cost: $40,000 |
- | - | - | - | - | - | - | - | - | - | $38,050 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$38,050 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $196,683 Cost: $209,951 |
$17,422 | 210,917 | $3,468 | 597 | $2,381 | 329 | $11,520 | 48,000 | $10,692 | - | $151,200 | - | $17,422 210,917 kWh |
$3,468 597 kW-months/year |
$2,381 329 MMBtu |
$11,520 48,000 gal |
$10,692 - lb |
$151,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes |