IAC logo
IAC Assessment: SD0347
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0347
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2004
Principal Product plastics bags
NAICS 326111 - Plastics Bag and Pouch Manufacturing
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 67,000
Annual Production 30,000,000 Tons
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $819,390 8,783,308 kWh $0.09
Electricity Demand $169,226 13,624 kW-months/year $12.42
TOTAL ENERGY COSTS $988,616
RECOMMENDED SAVINGS* $163,884 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,463
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,911
Cost:
$450
$6,688 71,690 $1,223 98 - - - - $6,688
71,690
kWh
$1,223
98
kW-months/year
-
-
lb
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,552
Cost:
-
$5,552 59,508 - - - - - - $5,552
59,508
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,721
Cost:
$21,387
$12,448 133,416 $2,273 183 - - - - $12,448
133,416
kWh
$2,273
183
kW-months/year
-
-
lb
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,700
Cost:
$18,500
- - - - $7,700 - - - -
-
kWh
-
-
kW-months/year
$7,700
-
lb
-
-
$
05: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$128,000
Cost:
$145,000
- - - - - - $128,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$128,000
-
$
TOTAL RECOMMENDED Savings:
$163,884
Cost:
$185,337
$24,688 264,614 $3,496 281 $7,700 - $128,000 - $24,688
264,614
kWh
$3,496
281
kW-months/year
$7,700
-
lb
$128,000
-
$
TOTAL IMPLEMENTED Savings:
$13,463
Cost:
$450
$12,240 131,198 $1,223 98 - - - - $12,240
131,198
kWh
$1,223
98
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes