IAC Assessment: SD0351
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0351
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2004
Principal Product Bricks
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3251 - Brick And Structural Clay Tile
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 150,000
Annual Production 80,000,000 Pieces
Production Hrs. Annual 7,224
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,480 1,594,732 kWh $0.07
Electricity Demand $72,118 7,425 kW-months/year $9.71
Natural Gas $488,108 89,289 MMBtu $5.47
TOTAL ENERGY COSTS $674,706
RECOMMENDED SAVINGS* $344,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $127,079
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$217,864
Cost:
$75,000
- - - - $217,864 39,858 - - -
-
kWh
-
-
kW-months/year
$217,864
39,858
MMBtu
-
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$80,766
Cost:
$255,442
$107,765 1,502,997 $25,518 2,628 $(-52,517) (-9,608) - - $107,765
1,502,997
kWh
$25,518
2,628
kW-months/year
$(-52,517)
(-9,608)
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$34,754
Cost:
$39,050
$28,375 395,752 $6,379 657 - - - - $28,375
395,752
kWh
$6,379
657
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,248
Cost:
$14,785
$5,918 82,541 $1,330 137 - - - - $5,918
82,541
kWh
$1,330
137
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,257
Cost:
$350
$1,393 20,825 $864 89 - - - - $1,393
20,825
kWh
$864
89
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$663
Cost:
-
$663 9,243 - - - - - - $663
9,243
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,391
Cost:
-
- - - - - - $1,391 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,391
-
$
TOTAL RECOMMENDED Savings:
$344,943
Cost:
$384,627
$144,114 2,011,358 $34,091 3,511 $165,347 30,250 $1,391 - $144,114
2,011,358
kWh
$34,091
3,511
kW-months/year
$165,347
30,250
MMBtu
$1,391
-
$
TOTAL IMPLEMENTED Savings:
$127,079
Cost:
$309,627
$144,114 2,011,358 $34,091 3,511 $(-52,517) (-9,608) $1,391 - $144,114
2,011,358
kWh
$34,091
3,511
kW-months/year
$(-52,517)
(-9,608)
MMBtu
$1,391
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost