IAC logo
IAC Assessment: SD0357
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0357
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product fiberglass tubs and showers
NAICS 326191 - Plastics Plumbing Fixture Manufacturing
SIC 3088 - Plastics Plumbing Fixtures
Sales $10,000,000-$50,000,000
# of Employees 262
Plant Area (Sq.Ft.) 95,520
Annual Production 180,000 Pieces
Production Hrs. Annual 6,024
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $192,512 2,908,836 kWh $0.07
Electricity Demand $56,012 5,846 kW-months/year $9.58
TOTAL ENERGY COSTS $250,595
RECOMMENDED SAVINGS* $987,601 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $638,017
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$416,473
Cost:
$750,000
- - - - $66,473 (-10,164) - - - - $350,000 - -
-
kWh
-
-
kW-months/year
$66,473
(-10,164)
MMBtu
-
-
lb
-
-
$
$350,000
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,472
Cost:
$10,980
$2,696 40,722 $776 81 - - - - - - - - $2,696
40,722
kWh
$776
81
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$31,776
Cost:
$50,000
- - - - - - $31,776 1,190 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$31,776
1,190
lb
-
-
$
-
-
$
04: 4.446 AUTOMATE FINISHING PROCESS Savings:
$314,336
Cost:
$500,000
- - - - - - - - $314,336 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$314,336
-
$
-
-
$
05: 4.446 AUTOMATE FINISHING PROCESS Savings:
$189,416
Cost:
$450,000
- - - - - - - - $189,416 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$189,416
-
$
-
-
$
06: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$32,128
Cost:
$29,639
- - - - - - - - - - $32,128 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$32,128
-
$
TOTAL RECOMMENDED Savings:
$987,601
Cost:
$1,790,619
$2,696 40,722 $776 81 $66,473 (-10,164) $31,776 1,190 $503,752 - $382,128 - $2,696
40,722
kWh
$776
81
kW-months/year
$66,473
(-10,164)
MMBtu
$31,776
1,190
lb
$503,752
-
$
$382,128
-
$
TOTAL IMPLEMENTED Savings:
$638,017
Cost:
$1,229,639
- - - - $66,473 (-10,164) - - $189,416 - $382,128 - -
-
kWh
-
-
kW-months/year
$66,473
(-10,164)
MMBtu
-
-
lb
$189,416
-
$
$382,128
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost