Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2005 |
Principal Product | Brick and clay potter |
NAICS | 327120 - Clay Building Material and Refractories Manufacturing |
SIC | 3251 - Brick And Structural Clay Tile |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 137,000 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $894,177 | 8,623,031 | kWh | $0.10 |
Electricity Demand | $308,784 | 23,416 | kW-months/year | $13.19 |
Natural Gas | $291,505 | 513,901 | MMBtu | $0.57 |
TOTAL ENERGY COSTS | $1,494,466 | |||
RECOMMENDED SAVINGS* | $1,898,244 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,308,000 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT |
Savings: $578,544 Cost: $2,450,000 |
- | - | - | - | $578,544 | 102,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
$578,544 102,000 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $570,334 Cost: $1,600,000 |
$688,485 | 6,639,200 | $126,624 | 9,600 | $(-244,775) | (-43,155) | - | - | - | - |
$688,485 6,639,200 kWh |
$126,624 9,600 kW-months/year |
$(-244,775) (-43,155) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $313,658 Cost: $79,766 |
$267,005 | 2,574,784 | $46,653 | 3,537 | - | - | - | - | - | - |
$267,005 2,574,784 kWh |
$46,653 3,537 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $75,000 Cost: $74,450 |
$75,000 | 721,000 | - | - | - | - | - | - | - | - |
$75,000 721,000 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $65,420 Cost: $68,600 |
$65,420 | 630,854 | - | - | - | - | - | - | - | - |
$65,420 630,854 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,645 Cost: $13,000 |
$11,614 | 112,000 | $2,031 | 154 | - | - | - | - | - | - |
$11,614 112,000 kWh |
$2,031 154 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,076 Cost: $1,300 |
$4,324 | 41,700 | $752 | 57 | - | - | - | - | - | - |
$4,324 41,700 kWh |
$752 57 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,012 Cost: $6,000 |
$2,564 | 24,725 | $448 | 34 | - | - | - | - | - | - |
$2,564 24,725 kWh |
$448 34 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $11,700 Cost: $18,500 |
- | - | - | - | - | - | $11,700 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$11,700 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $261,855 Cost: $40,000 |
- | - | - | - | - | - | - | - | $261,855 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$261,855 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,898,244 Cost: $4,351,616 |
$1,114,412 | 10,744,263 | $176,508 | 13,382 | $333,769 | 58,845 | $11,700 | - | $261,855 | - | $1,114,412 10,744,263 kWh |
$176,508 13,382 kW-months/year |
$333,769 58,845 MMBtu |
$11,700 - lb |
$261,855 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,308,000 Cost: $1,883,116 |
$1,114,412 | 10,744,263 | $176,508 | 13,382 | $(-244,775) | (-43,155) | - | - | $261,855 | - | $1,114,412 10,744,263 kWh |
$176,508 13,382 kW-months/year |
$(-244,775) (-43,155) MMBtu |
- - lb |
$261,855 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |