Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2005 |
Principal Product | plastic products |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 110,000 Pieces |
Production Hrs. Annual | 4,284 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $104,569 | 1,070,948 | kWh | $0.10 |
Electricity Demand | $44,474 | 6,985 | kW-months/year | $6.37 |
Natural Gas | $20,948 | 25,776 | MMBtu | $0.81 |
TOTAL ENERGY COSTS | $169,991 | |||
RECOMMENDED SAVINGS* | $148,088 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $123,429 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | One-time Revenue or Avoided Cost | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | One-time Revenue or Avoided Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,915 Cost: $3,400 |
$1,546 | 15,845 | $369 | 58 | - | - | - | - | - | - | - | - |
$1,546 15,845 kWh |
$369 58 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $1,670 Cost: $75 |
$1,670 | 17,130 | - | - | - | - | - | - | - | - | - | - |
$1,670 17,130 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,553 Cost: $200 |
$1,553 | 15,912 | - | - | - | - | - | - | - | - | - | - |
$1,553 15,912 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES |
Savings: $1,250 Cost: $160 |
$1,054 | 10,749 | $196 | 31 | - | - | - | - | - | - | - | - |
$1,054 10,749 kWh |
$196 31 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $1,172 Cost: $900 |
$860 | 8,808 | $312 | 49 | - | - | - | - | - | - | - | - |
$860 8,808 kWh |
$312 49 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $695 Cost: - |
$695 | 7,126 | - | - | - | - | - | - | - | - | - | - |
$695 7,126 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,771 Cost: $17,633 |
$12,510 | 128,177 | $2,261 | 355 | - | - | - | - | - | - | - | - |
$12,510 128,177 kWh |
$2,261 355 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,248 Cost: $10,000 |
- | - | - | - | $5,248 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,248 - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $19,018 Cost: $24,500 |
- | - | - | - | - | - | - | - | - | - | $19,018 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
$19,018 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $98,038 Cost: $1,964 |
- | - | - | - | - | - | - | - | $98,038 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$98,038 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $2,758 Cost: $3,500 |
- | - | - | - | - | - | $2,758 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$2,758 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $148,088 Cost: $62,332 |
$19,888 | 203,747 | $3,138 | 493 | $5,248 | - | $2,758 | - | $98,038 | - | $19,018 | - | $19,888 203,747 kWh |
$3,138 493 kW-months/year |
$5,248 - lb |
$2,758 - $ |
$98,038 - $ |
$19,018 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $123,429 Cost: $30,199 |
$3,419 | 35,005 | $196 | 31 | - | - | $2,758 | - | $98,038 | - | $19,018 | - | $3,419 35,005 kWh |
$196 31 kW-months/year |
- - lb |
$2,758 - $ |
$98,038 - $ |
$19,018 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | One-time Revenue or Avoided Cost | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | One-time Revenue or Avoided Cost | By-product Production |