IAC logo
IAC Assessment: SD0367
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0367
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product Faucets and Coatings
NAICS 332913 - Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 57,000
Annual Production 357 Tons
Production Hrs. Annual 7,344
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,866 1,207,016 kWh $0.08
Electricity Demand $54,929 3,843 kW-months/year $14.29
Natural Gas $22,360 28,451 MMBtu $0.79
TOTAL ENERGY COSTS $178,155
RECOMMENDED SAVINGS* $61,750 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,944
Cost:
$23,500
$12,463 149,083 $3,481 244 - - - - - - $12,463
149,083
kWh
$3,481
244
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,834
Cost:
$15,130
$5,890 70,455 $3,944 276 - - - - - - $5,890
70,455
kWh
$3,944
276
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$7,652
Cost:
$8,000
$4,580 54,787 $3,072 215 - - - - - - $4,580
54,787
kWh
$3,072
215
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$5,688
Cost:
$3,722
- - - - $5,688 724 - - - - -
-
kWh
-
-
kW-months/year
$5,688
724
MMBtu
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,803
Cost:
$1,750
$2,974 35,575 $829 58 - - - - - - $2,974
35,575
kWh
$829
58
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,567
Cost:
$100
$1,260 15,067 $307 25 - - - - - - $1,260
15,067
kWh
$307
25
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$448
Cost:
$47
- - - - $448 57 - - - - -
-
kWh
-
-
kW-months/year
$448
57
MMBtu
-
-
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$377
Cost:
$525
$295 3,523 $82 6 - - - - - - $295
3,523
kWh
$82
6
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$663
Cost:
$60
$663 7,932 - - - - - - - - $663
7,932
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
10: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$15,774
Cost:
$17,000
- - - - - - $5,598 - $10,176 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,598
-
lb
$10,176
-
$
TOTAL RECOMMENDED Savings:
$61,750
Cost:
$69,834
$28,125 336,422 $11,715 824 $6,136 781 $5,598 - $10,176 - $28,125
336,422
kWh
$11,715
824
kW-months/year
$6,136
781
MMBtu
$5,598
-
lb
$10,176
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) By-product Production