Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2005 |
Principal Product | Faucets and Coatings |
NAICS | 332913 - Plumbing Fixture Fitting and Trim Manufacturing |
SIC | 3432 - Plumbing Fixture Fittings And Trim |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 57,000 |
Annual Production | 357 Tons |
Production Hrs. Annual | 7,344 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,866 | 1,207,016 | kWh | $0.08 |
Electricity Demand | $54,929 | 3,843 | kW-months/year | $14.29 |
Natural Gas | $22,360 | 28,451 | MMBtu | $0.79 |
TOTAL ENERGY COSTS | $178,155 | |||
RECOMMENDED SAVINGS* | $61,750 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $15,944 Cost: $23,500 |
$12,463 | 149,083 | $3,481 | 244 | - | - | - | - | - | - |
$12,463 149,083 kWh |
$3,481 244 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,834 Cost: $15,130 |
$5,890 | 70,455 | $3,944 | 276 | - | - | - | - | - | - |
$5,890 70,455 kWh |
$3,944 276 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $7,652 Cost: $8,000 |
$4,580 | 54,787 | $3,072 | 215 | - | - | - | - | - | - |
$4,580 54,787 kWh |
$3,072 215 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2514 COVER OPEN TANKS |
Savings: $5,688 Cost: $3,722 |
- | - | - | - | $5,688 | 724 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,688 724 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,803 Cost: $1,750 |
$2,974 | 35,575 | $829 | 58 | - | - | - | - | - | - |
$2,974 35,575 kWh |
$829 58 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,567 Cost: $100 |
$1,260 | 15,067 | $307 | 25 | - | - | - | - | - | - |
$1,260 15,067 kWh |
$307 25 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $448 Cost: $47 |
- | - | - | - | $448 | 57 | - | - | - | - |
- - kWh |
- - kW-months/year |
$448 57 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $377 Cost: $525 |
$295 | 3,523 | $82 | 6 | - | - | - | - | - | - |
$295 3,523 kWh |
$82 6 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $663 Cost: $60 |
$663 | 7,932 | - | - | - | - | - | - | - | - |
$663 7,932 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $15,774 Cost: $17,000 |
- | - | - | - | - | - | $5,598 | - | $10,176 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,598 - lb |
$10,176 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,750 Cost: $69,834 |
$28,125 | 336,422 | $11,715 | 824 | $6,136 | 781 | $5,598 | - | $10,176 | - | $28,125 336,422 kWh |
$11,715 824 kW-months/year |
$6,136 781 MMBtu |
$5,598 - lb |
$10,176 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | By-product Production |