IAC Assessment: SD0368
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0368
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product Sugar
NAICS 311314 - Cane Sugar Manufacturing
SIC 2062 - Cane Sugar Refining
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 600,000
Annual Production 1,400,000 Tons
Production Hrs. Annual 3,696
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Natural Gas $359,170 601,421 MMBtu $0.60
Fuel Oil #2 $178,551 31,665 MMBtu $5.64
Coal $1,873,185 702,822 MMBtu $2.67
TOTAL ENERGY COSTS $2,410,906
RECOMMENDED SAVINGS* $1,138,884 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Increase in Production Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Increase in Production
$ kWh $ MMBtu $ lb $ $ $ $ $ %
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$85,079
Cost:
$99,260
- - $85,079 15,032 - - - - - - - - -
-
kWh
$85,079
15,032
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$82,308
Cost:
$130,000
$82,308 1,704,091 - - - - - - - - - - $82,308
1,704,091
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$49,689
Cost:
$30,500
$49,689 1,028,768 - - - - - - - - - - $49,689
1,028,768
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$41,386
Cost:
$11,940
- - $41,386 7,312 - - - - - - - - -
-
kWh
$41,386
7,312
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$39,379
Cost:
$59,781
$39,379 815,305 - - - - - - - - - - $39,379
815,305
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,259
Cost:
$4,056
- - $5,259 929 - - - - - - - - -
-
kWh
$5,259
929
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,660
Cost:
$13,282
$6,660 137,889 - - - - - - - - - - $6,660
137,889
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
08: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$539,275
Cost:
$68,000
- - - - - - - - $539,275 - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$539,275
-
$
-
-
%
09: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$194,263
Cost:
$172,000
- - - - - - - - - - $194,263 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$194,263
-
%
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$15,102
Cost:
$20,000
- - - - $15,102 - - - - - - - -
-
kWh
-
-
MMBtu
$15,102
-
lb
-
-
$
-
-
$
-
-
%
11: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$80,484
Cost:
$5,965
- - - - - - $80,484 - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
$80,484
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,138,884
Cost:
$614,784
$178,036 3,686,053 $131,724 23,273 $15,102 - $80,484 - $539,275 - $194,263 - $178,036
3,686,053
kWh
$131,724
23,273
MMBtu
$15,102
-
lb
$80,484
-
$
$539,275
-
$
$194,263
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Increase in Production Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Increase in Production