IAC Assessment: SD0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product Integrated Circuit test handling units
NAICS 332913 - Plumbing Fixture Fitting and Trim Manufacturing
SIC 3569 - General Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 338,000
Annual Production 120 Pieces
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $790,690 8,712,713 kWh $0.09
Electricity Demand $277,396 18,222 kW-months/year $15.22
TOTAL ENERGY COSTS $1,068,086
RECOMMENDED SAVINGS* $222,844 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,867
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$169,717
Cost:
$252,000
$132,656 1,460,966 $37,061 2,435 - - $132,656
1,460,966
kWh
$37,061
2,435
kW-months/year
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$17,291
Cost:
-
$17,291 190,433 - - - - $17,291
190,433
kWh
-
-
kW-months/year
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,639
Cost:
$648
$5,189 57,150 $1,450 95 - - $5,189
57,150
kWh
$1,450
95
kW-months/year
-
-
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,877
Cost:
$12,575
$4,877 53,712 - - - - $4,877
53,712
kWh
-
-
kW-months/year
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,896
Cost:
$10,102
$8,522 93,852 $2,374 156 - - $8,522
93,852
kWh
$2,374
156
kW-months/year
-
-
lb
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$395
Cost:
$80
$395 4,355 - - - - $395
4,355
kWh
-
-
kW-months/year
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$285
Cost:
$161
$197 2,164 $88 6 - - $197
2,164
kWh
$88
6
kW-months/year
-
-
lb
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$12,744
Cost:
$17,000
- - - - $12,744 382,088 -
-
kWh
-
-
kW-months/year
$12,744
382,088
lb
TOTAL RECOMMENDED Savings:
$222,844
Cost:
$292,566
$169,127 1,862,632 $40,973 2,692 $12,744 382,088 $169,127
1,862,632
kWh
$40,973
2,692
kW-months/year
$12,744
382,088
lb
TOTAL IMPLEMENTED Savings:
$28,867
Cost:
$10,343
$26,405 290,804 $2,462 162 - - $26,405
290,804
kWh
$2,462
162
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)