IAC Assessment: SD0373
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0373
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product Cookie
NAICS 311821 - Cookie and Cracker Manufacturing
SIC 2052 - Cookies And Crackers
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 80,000
Annual Production 4,600,000 Pounds
Production Hrs. Annual 6,468
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,869 1,567,182 kWh $0.09
Electricity Demand $63,805 4,247 kW-months/year $15.02
Natural Gas $67,841 8,173 MMBtu $8.30
TOTAL ENERGY COSTS $275,515
RECOMMENDED SAVINGS* $260,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$34,083
Cost:
$56,520
- - - - $34,083 3,998 - - -
-
kWh
-
-
kW-months/year
$34,083
3,998
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,494
Cost:
$3,900
$4,948 53,900 $4,506 300 $(-1,960) 230 - - $4,948
53,900
kWh
$4,506
300
kW-months/year
$(-1,960)
230
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,208
Cost:
-
$5,066 55,188 $1,142 76 - - - - $5,066
55,188
kWh
$1,142
76
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,475
Cost:
$450
$1,475 16,068 - - - - - - $1,475
16,068
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,918
Cost:
$36,052
$10,677 116,308 $3,241 216 - - - - $10,677
116,308
kWh
$3,241
216
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,982
Cost:
$615
$4,982 54,273 - - - - - - $4,982
54,273
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,212
Cost:
$90
$3,212 34,992 - - - - - - $3,212
34,992
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$171,742
Cost:
$50,000
- - - - - - $171,742 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$171,742
-
$
09: 4.446 AUTOMATE FINISHING PROCESS Savings:
$17,209
Cost:
$30,000
- - - - - - $17,209 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,209
-
$
TOTAL RECOMMENDED Savings:
$260,323
Cost:
$177,627
$30,360 330,729 $8,889 592 $32,123 4,228 $188,951 - $30,360
330,729
kWh
$8,889
592
kW-months/year
$32,123
4,228
MMBtu
$188,951
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes