Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2006 |
Principal Product | Precision Aluminum Forgings |
NAICS | 332112 - Nonferrous Forging |
SIC | 3463 - Nonferrous Forgings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 98 |
Plant Area (Sq.Ft.) | 175,564 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 5,250 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $324,730 | 3,660,402 | kWh | $0.09 |
Electricity Demand | $161,275 | 13,646 | kW-months/year | $11.82 |
Natural Gas | $318,764 | 4,241 | MMBtu | $75.16 |
TOTAL ENERGY COSTS | $804,769 | |||
RECOMMENDED SAVINGS* | $126,894 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,696 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $16,903 Cost: $13,350 |
$13,759 | 155,120 | $3,144 | 266 | - | - | - | - | - | - |
$13,759 155,120 kWh |
$3,144 266 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,954 Cost: $7,595 |
$6,862 | 77,358 | $2,092 | 177 | - | - | - | - | - | - |
$6,862 77,358 kWh |
$2,092 177 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,356 Cost: $14,145 |
- | - | - | - | $7,356 | 979 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,356 979 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,793 Cost: $3,000 |
$1,793 | 20,209 | - | - | - | - | - | - | - | - |
$1,793 20,209 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,983 Cost: $537 |
$6,983 | 7,812 | - | - | - | - | - | - | - | - |
$6,983 7,812 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,079 Cost: $3,500 |
$2,079 | 23,436 | - | - | - | - | - | - | - | - |
$2,079 23,436 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,700 Cost: $18,500 |
- | - | - | - | - | - | - | - | $5,700 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$5,700 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $77,126 Cost: $70,000 |
- | - | - | - | - | - | $77,126 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$77,126 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $126,894 Cost: $130,627 |
$31,476 | 283,935 | $5,236 | 443 | $7,356 | 979 | $77,126 | - | $5,700 | - | $31,476 283,935 kWh |
$5,236 443 kW-months/year |
$7,356 979 MMBtu |
$77,126 - $ |
$5,700 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,696 Cost: $16,350 |
$15,552 | 175,329 | $3,144 | 266 | - | - | - | - | - | - | $15,552 175,329 kWh |
$3,144 266 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |