IAC Assessment: SD0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2006
Principal Product Precision Aluminum Forgings
NAICS 332112 - Nonferrous Forging
SIC 3463 - Nonferrous Forgings
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 175,564
Annual Production 6,000,000 Pounds
Production Hrs. Annual 5,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $324,730 3,660,402 kWh $0.09
Electricity Demand $161,275 13,646 kW-months/year $11.82
Natural Gas $318,764 4,241 MMBtu $75.16
TOTAL ENERGY COSTS $804,769
RECOMMENDED SAVINGS* $126,894 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,696
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,903
Cost:
$13,350
$13,759 155,120 $3,144 266 - - - - - - $13,759
155,120
kWh
$3,144
266
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,954
Cost:
$7,595
$6,862 77,358 $2,092 177 - - - - - - $6,862
77,358
kWh
$2,092
177
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,356
Cost:
$14,145
- - - - $7,356 979 - - - - -
-
kWh
-
-
kW-months/year
$7,356
979
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,793
Cost:
$3,000
$1,793 20,209 - - - - - - - - $1,793
20,209
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,983
Cost:
$537
$6,983 7,812 - - - - - - - - $6,983
7,812
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,079
Cost:
$3,500
$2,079 23,436 - - - - - - - - $2,079
23,436
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,700
Cost:
$18,500
- - - - - - - - $5,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$5,700
-
$
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$77,126
Cost:
$70,000
- - - - - - $77,126 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$77,126
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$126,894
Cost:
$130,627
$31,476 283,935 $5,236 443 $7,356 979 $77,126 - $5,700 - $31,476
283,935
kWh
$5,236
443
kW-months/year
$7,356
979
MMBtu
$77,126
-
$
$5,700
-
$
TOTAL IMPLEMENTED Savings:
$18,696
Cost:
$16,350
$15,552 175,329 $3,144 266 - - - - - - $15,552
175,329
kWh
$3,144
266
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost