IAC Assessment: SD0380
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0380
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2006
Principal Product window blinds
NAICS 337920 - Blind and Shade Manufacturing
SIC 2591 - Drapery Hardware & Blinds & Shades
Sales $100,000,000-$500,000,000
# of Employees 377
Plant Area (Sq.Ft.) 201,000
Annual Production 0 Units
Production Hrs. Annual 3,438
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,823 2,444,449 kWh $0.07
Electricity Demand $52,930 6,628 kW-months/year $7.99
Natural Gas $8,068 859 MMBtu $9.39
TOTAL ENERGY COSTS $222,821
RECOMMENDED SAVINGS* $16,722 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,026
Cost:
$3,850
$7,758 117,193 $3,268 409 $7,758
117,193
kWh
$3,268
409
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,324
Cost:
$220
$1,637 24,726 $687 86 $1,637
24,726
kWh
$687
86
kW-months/year
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,495
Cost:
$4,550
$1,495 22,578 - - $1,495
22,578
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,418
Cost:
$2,325
$1,418 21,427 - - $1,418
21,427
kWh
-
-
kW-months/year
05: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$459
Cost:
$3,193
$323 4,879 $136 17 $323
4,879
kWh
$136
17
kW-months/year
TOTAL RECOMMENDED Savings:
$16,722
Cost:
$14,138
$12,631 190,803 $4,091 512 $12,631
190,803
kWh
$4,091
512
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand