IAC logo
IAC Assessment: SD0389
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0389
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2006
Principal Product Tomato Paste
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 200,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 5,124
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $671,077 9,065,393 kWh $0.07
Electricity Demand $204,564 22,980 kW-months/year $8.90
Natural Gas $6,603,311 931,213 MMBtu $7.09
TOTAL ENERGY COSTS $7,478,952
RECOMMENDED SAVINGS* $233,444 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,543
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$231,300
Cost:
$1,500,000
$202,331 2,734,200 $28,969 3,255 - - $202,331
2,734,200
kWh
$28,969
3,255
kW-months/year
-
-
MMBtu
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$846
Cost:
$480
$392 5,304 $454 51 - - $392
5,304
kWh
$454
51
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$433
Cost:
$2,797
$273 3,686 $160 18 - - $273
3,686
kWh
$160
18
kW-months/year
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$601
Cost:
$4,125
- - - - $601 85 -
-
kWh
-
-
kW-months/year
$601
85
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$264
Cost:
$1,006
$167 2,257 $97 11 - - $167
2,257
kWh
$97
11
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$233,444
Cost:
$1,508,408
$203,163 2,745,447 $29,680 3,335 $601 85 $203,163
2,745,447
kWh
$29,680
3,335
kW-months/year
$601
85
MMBtu
TOTAL IMPLEMENTED Savings:
$1,543
Cost:
$4,283
$832 11,247 $711 80 - - $832
11,247
kWh
$711
80
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas