IAC Assessment: SD0397
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0397
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2007
Principal Product steel precision investment casting
NAICS 331512 - Steel Investment Foundries
SIC 3324 - Steel Investment Foundries
Sales $10,000,000-$50,000,000
# of Employees 184
Plant Area (Sq.Ft.) 162,000
Annual Production 1 Units
Production Hrs. Annual 6,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $535,580 9,062,279 kWh $0.06
Electricity Demand $195,076 44,538 kW-months/year $4.38
Natural Gas $335,142 8,193,500 MMBtu $0.04
TOTAL ENERGY COSTS $1,065,798
RECOMMENDED SAVINGS* $154,822 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,792
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$51,686
Cost:
$51,240
- - - - $51,686 1,076,800 -
-
kWh
-
-
kW-months/year
$51,686
1,076,800
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$52,328
Cost:
$44,175
$52,328 314,818 - - - - $52,328
314,818
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,149
Cost:
$18,100
$3,149 58,284 - - - - $3,149
58,284
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,700
Cost:
$23,250
$19,700 333,333 - - - - $19,700
333,333
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,897
Cost:
$420
$6,878 116,376 $1,019 232 - - $6,878
116,376
kWh
$1,019
232
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,198
Cost:
$17,214
$6,269 106,080 $929 212 - - $6,269
106,080
kWh
$929
212
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,697
Cost:
$71,224
$5,832 98,682 $865 197 - - $5,832
98,682
kWh
$865
197
kW-months/year
-
-
MMBtu
08: 2.7145 INSTALL SKYLIGHTS Savings:
$4,924
Cost:
$13,330
$4,289 72,576 $635 145 - - $4,289
72,576
kWh
$635
145
kW-months/year
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,243
Cost:
$3,825
$1,081 18,307 $162 37 - - $1,081
18,307
kWh
$162
37
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$154,822
Cost:
$242,778
$99,526 1,118,456 $3,610 823 $51,686 1,076,800 $99,526
1,118,456
kWh
$3,610
823
kW-months/year
$51,686
1,076,800
MMBtu
TOTAL IMPLEMENTED Savings:
$21,792
Cost:
$88,858
$18,979 321,138 $2,813 641 - - $18,979
321,138
kWh
$2,813
641
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas