IAC logo
IAC Assessment: SD0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2007
Principal Product Asphalt Shingle
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 52
Plant Area (Sq.Ft.) 410,000
Annual Production 122,275 Tons
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,994 3,427,840 kWh $0.07
Electricity Demand $95,942 7,854 kW-months/year $12.22
Electricity Fees $9,300 - $ -
Natural Gas $358,042 38,902 MMBtu $9.20
TOTAL ENERGY COSTS $697,278
RECOMMENDED SAVINGS* $267,481 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,816
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$221,890
Cost:
$474,000
$226,619 3,318,000 $57,923 4,740 $(-62,652) (-6,810) $226,619
3,318,000
kWh
$57,923
4,740
kW-months/year
$(-62,652)
(-6,810)
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$25,093
Cost:
$7,520
- - - - $25,093 27,275 -
-
kWh
-
-
kW-months/year
$25,093
27,275
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,958
Cost:
$16,600
$10,805 158,193 $3,153 258 - - $10,805
158,193
kWh
$3,153
258
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,724
Cost:
$7,500
$3,724 47,937 - - - - $3,724
47,937
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,816
Cost:
$2,235
$2,816 41,237 - - - - $2,816
41,237
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$267,481
Cost:
$507,855
$243,964 3,565,367 $61,076 4,998 $(-37,559) 20,465 $243,964
3,565,367
kWh
$61,076
4,998
kW-months/year
$(-37,559)
20,465
MMBtu
TOTAL IMPLEMENTED Savings:
$2,816
Cost:
$2,235
$2,816 41,237 - - - - $2,816
41,237
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas