IAC logo
IAC Assessment: SD0403
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0403
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2008
Principal Product valves
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 246,000
Annual Production 3 Units
Production Hrs. Annual 5,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $800,244 8,693,126 kWh $0.09
Electricity Demand $309,773 73,873 kW-months/year $4.19
Electricity Fees $337,544 - $ -
Natural Gas $42,675 4,496 MMBtu $9.49
TOTAL ENERGY COSTS $1,490,236
RECOMMENDED SAVINGS* $230,506 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $169,607
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$148,069
Cost:
$13,073
$148,069 1,124,145 - - - - $148,069
1,124,145
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,157
Cost:
$15,033
$11,334 86,122 $1,823 199 - - $11,334
86,122
kWh
$1,823
199
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,381
Cost:
$13,275
$8,381 63,686 - - - - $8,381
63,686
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,873
Cost:
$6,500
$2,873 21,831 - - - - $2,873
21,831
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$58,026
Cost:
$12,356
- - - - $58,026 61,080 -
-
kWh
-
-
kW-months/year
$58,026
61,080
MMBtu
TOTAL RECOMMENDED Savings:
$230,506
Cost:
$60,237
$170,657 1,295,784 $1,823 199 $58,026 61,080 $170,657
1,295,784
kWh
$1,823
199
kW-months/year
$58,026
61,080
MMBtu
TOTAL IMPLEMENTED Savings:
$169,607
Cost:
$41,381
$167,784 1,273,953 $1,823 199 - - $167,784
1,273,953
kWh
$1,823
199
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas